-
Start Preamble
AGENCY:
Coast Guard, DHS.
ACTION:
Temporary final rule.
SUMMARY:
The Coast Guard has temporarily changed the drawbridge operating regulations governing the operation of the Route 82 Bridge across the Connecticut River at mile 16.8, at East Haddam, Connecticut. This temporary final rule requires the Route 82 Bridge to operate on a fixed opening schedule from April 1, 2006 through June 30, 2006. The bridge shall open at all times for commercial vessels after at least a 24-hour advance notice and a 2-hour confirmation is given by calling the number posted at the bridge. This temporary final rule is necessary to facilitate electrical and mechanical bridge repairs.
DATES:
This rule is effective from April 1, 2006 through June 30, 2006.
ADDRESSES:
Comments and material received from the public, as well as documents indicated in this preamble as being available in the docket, are part of docket (CGD01-06-004) and are available for inspection or copying at the First Coast Guard District, Bridge Branch Office, 408 Atlantic Avenue, Boston, Massachusetts, 02110, between 7 a.m. and 3 p.m., Monday through Friday, except Federal holidays.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ms. Judy Leung-Yee, Project Officer, First Coast Guard District, (212) 668-7195.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Regulatory Information
On March 6, 2006, we published a notice of proposed rulemaking (NPRM) entitled “Drawbridge Operation Regulations”; Connecticut River, East Haddam, Connecticut, in the Federal Register (71 FR 11172). We received no comments in response to the notice of proposed rulemaking. No public hearing was requested and none was held.
Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good cause exists for making this rule effective less than 30 days after publication in the Federal Register.
Making this rule effective in less than 30 days after publication in the Federal Register will allow this rule to become effective in time for the April 1, 2006, start date for the electrical and mechanical bridge repairs.
The electrical and mechanical repairs are vital necessary repairs that must be performed without delay in order to assure the continued safe and reliable operation of the Route 82 Bridge.
Background and Purpose
The Route 82 Bridge has a vertical clearance of 22 feet at mean high water, and 25 feet at mean low water in the closed position. The existing drawbridge operating regulations listed at 33 CFR 117.205(c), require the bridge to open on signal at all times; except that, from May 15 to October 31, 9 a.m. to 9 p.m., the bridge is required to open for recreational vessels on the hour and half hour only. The bridge is required to open on signal at all times for commercial vessels.
The bridge owner, Connecticut Department of Transportation, requested a temporary rule to facilitate electrical Start Printed Page 17349and mechanical rehabilitation at the Route 82 Bridge.
Under this temporary final rule, from April 1, 2006 through June 30, 2006, the Route 82 Bridge shall open on signal at 5:30 a.m., 1:30 p.m., and 8 p.m., daily. The bridge shall open for commercial vessels at any time after a 24-hour notice with a 2-hour confirmation is given by calling the number posted at the bridge.
Discussion of Comments and Changes
The Coast Guard received no comments in response to the notice of proposed rulemaking. As a result, no changes have been made to this temporary final rule.
Regulatory Evaluation
This rule is not a “significant regulatory action” under section 3(f) of Executive Order 12866, Regulatory Planning and Review, and does not require an assessment of potential costs and benefits under section 6(a)(3), of that Order. The Office of Management and Budget has not reviewed it under that Order. It is not “significant” under the regulatory policies and procedures of the Department of Homeland Security (DHS).
This conclusion is based on the fact that vessel traffic will still be able to transit through the Route 82 Bridge under a fixed opening schedule that is expected to meet the present and anticipated needs of navigation.
Small Entities
Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we considered whether this rule would have a significant economic impact on a substantial number of small entities. The term “small entities” comprises small businesses, not-for profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations less than 50,000.
The Coast Guard certifies under 5 U.S.C. 605(b), that this rule will not have a significant economic impact on a substantial number of small entities.
This conclusion is based on the fact that vessel traffic will still be able to transit through the Route 82 Bridge under a fixed opening schedule that is expected to meet the present and anticipated needs of navigation.
Assistance for Small Entities
Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we offered to assist small entities in understanding the rule so that they could better evaluate its effects on them and participate in the rulemaking process.
No small entities requested Coast Guard assistance and none was given.
Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR (1-888-734-3247).
Collection of Information
This rule calls for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).
Federalism
A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on State or local governments and would either preempt State law or impose a substantial direct cost of compliance on them. We have analyzed this rule under that Order and have determined that it does not have implications for federalism.
Unfunded Mandates Reform Act
The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.
Taking of Private Property
This rule will not effect a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.
Civil Justice Reform
This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.
Protection of Children
We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not concern an environmental risk to health or risk to safety that may disproportionately affect children.
Indian Tribal Governments
This final rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.
Energy Effects
We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a “significant energy action” under that order because it is not a “significant regulatory action” under Executive Order 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. The Administrator of the Office of Information and Regulatory Affairs has not designated it as a significant energy action. Therefore, it does not require a Statement of Energy Effects under Executive Order 13211.
Technical Standards
The National Technology Transfer and Advancement Act (NTTAA) (15 U.S.C. 272 note) directs agencies to use voluntary consensus standards in their regulatory activities unless the agency provides Congress, through the Office of Management and Budget, with an explanation of why using these standards would be inconsistent with applicable law or otherwise impractical. Voluntary consensus standards are technical standards (e.g., specifications of materials, performance, design, or operation; test methods; sampling procedures; and related management systems practices) that are developed or adopted by voluntary consensus standards bodies.
This rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards.
Environment
We have analyzed this rule under Commandant Instruction M16475.1D, Start Printed Page 17350which guides the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have concluded that there are no factors in this case that would limit the use of a categorical exclusion under section 2.B.2 of the Instruction. Therefore, this rule is categorically excluded, under figure 2-1, paragraph (32)(e), of the Instruction, from further environmental documentation considering that it relates to the promulgation of operating regulations or procedures for drawbridges. Under figure 2-1, paragraph (32)(e), of the Instruction, an “Environmental Analysis Check List” and a “Categorical Exclusion Determination” are not required for this rule.
Start List of SubjectsList of Subjects in 33 CFR Part 117
- Bridges
Regulations
Start Amendment PartFor the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 117 as follows:
End Amendment Part Start PartPART 117—DRAWBRIDGE OPERATION REGULATIONS
End Part Start Amendment Part1. The authority citation for part 117 continues to read as follows:
End Amendment Part Start Amendment Part2. From April 1, 2006 through June 30, 2006, § 117.205 is amended by suspending paragraph (c) and adding a temporary paragraph (d) to read as follows:
End Amendment PartConnecticut River.* * * * *(d) The draw of the Route 82 Bridge, mile 16.8, at East Haddam, shall open on signal at 5:30 a.m., 1:30 p.m., and 8 p.m., daily. The draw shall open on signal for commercial vessels at any time after at least a 24-hour advance notice and a 2-hour confirmation is given by calling the number posted at the bridge.
Dated: March 28, 2006.
David P. Pekoske,
Rear Admiral, U.S. Coast Guard, Commander, First Coast Guard District.
[FR Doc. 06-3287 Filed 4-5-06; 8:45 am]
BILLING CODE 4910-15-P
Document Information
- Effective Date:
- 4/1/2006
- Published:
- 04/06/2006
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Temporary final rule.
- Document Number:
- 06-3287
- Dates:
- This rule is effective from April 1, 2006 through June 30, 2006.
- Pages:
- 17348-17350 (3 pages)
- Docket Numbers:
- CGD01-06-004
- RINs:
- 1625-AA09: Drawbridge Regulations
- RIN Links:
- https://www.federalregister.gov/regulations/1625-AA09/drawbridge-regulations
- Topics:
- Bridges
- PDF File:
- 06-3287.pdf
- CFR: (1)
- 33 CFR 117.205