06-5237. Office of Hazardous Materials Safety; Notice of Delays in Processing of Special Permit Applications
-
Start Preamble
AGENCY:
Pipeline and Hazardous Materials Safety Administration, DOT.
ACTION:
List of Application Delayed more than 180 days.
SUMMARY:
In accordance with the requirements of 49 U.S.C. 5117(c), PHMSA is publishing the following list of special permit applications that have been in process for 180 days or more. The reason(s) for delay and the expected completion date for action on each application is provided in association with each identified application.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ann Mazzullo, Office of Hazardous Materials Special Permits and Approvals, Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, 400 Seventh Street, SW., Washington, DC 20590-0001, (202) 366-4535.
Key to “Reason for Delay”
1. Awaiting additional information from applicant.
2. Extensive public comment under review.
3. Application is technically complex and is of significant impact or precedent-setting and requires extensive analysis.
4. Staff review delayed by other priority issues or volume of special permit applications.
Meaning of Application Number Suffixes
N—New application.
M—Modification request.
X—Renewal.
PM—Party to application with modification request.
Start SignatureIssued in Washington, DC on June 05, 2006.
R. Ryan Posten,
Chief, Special Permits Program, Office of Hazardous Materials Safety, Special Permits & Approvals.
Start Printed Page 33507 End Further Info End PreambleApplication No. Applicant Reason for delay Estimated date of completion New Special Permit Applications 13341-N National Propane Gas Association, Washington, DC 3 07-31-2006 13347-N Amvac Chemical Corporation, Los Angeles, CA 4 06-30-2006 13563-N Applied Companies, Valencia, CA 1 07-31-2006 14184-N Global Refrigerants,Inc., Denver, CO 4 06-30-2006 14229-N Senex Explosives, Inc., Cuddy, PA 4 06-30-2006 14239-N Marlin Gas Transport, Inc., Odessa, FL 1 06-30-2006 14257-N Origin Energy American Samoa, Inc., Pago Pago, AS 4 06-30-2006 14270-N Piper Metal Forming Corporation, New Albany, MS 3, 4 08-31-2006 14267-N Department of Energy, Washington, DC 1 06-30-2006 14289-N City Machine & Welding, Inc., Amarillo, TX 4 08-31-2006 14285-N INO Therapeutics LLC, Port Allen, LA 4 08-31-2006 14283-N U.S. Department of Energy (DOE), Washington, DC 1 06-30-2006 14277-N Ascus Technologies, Ltd., Cleveland, OH 3, 4 08-31-2006 14266-N NCF Industries, Inc., Santa Maria, CA 3 08-31-2006 14237-N Advanced Technology Materials, Inc. (ATMI), Danbury, CT 1 08-31-2006 14232-N Luxfer Gas Cylinders—Composite Cylinder Division, Riverside, CA 4 06-30-2006 14221-N U.S. Department of Energy, Washington, DC 4 06-30-2006 14163-N Air Liquide America, L.P., Houston, TX 4 06-30-2006 Modification to Special Permits 11903-M Comptank Corporation, Bothwell, ON 4 06-30-2006 13182-M Cytec Industries Inc., West Paterson, NJ 3, 4 06-30-2006 14237-M Austin Powder Illinois Company, Cleveland, OH 3, 4 06-30-2006 13583-M Structural Composites Industries, Pomona, CA 3, 4 06-30-2006 [FR Doc. 06-5237 Filed 6-8-06; 8:45 am]
BILLING CODE 4910-60-M
Document Information
- Published:
- 06/09/2006
- Department:
- Pipeline and Hazardous Materials Safety Administration
- Entry Type:
- Notice
- Action:
- List of Application Delayed more than 180 days.
- Document Number:
- 06-5237
- Pages:
- 33506-33507 (2 pages)
- PDF File:
- 06-5237.pdf