November 24, 2010.
Take notice that on November 18, 2010, Transcontinental Gas Pipe Line Company, LLC (Transco), Post Office Box 1396, Houston, Texas 77251, filed an abbreviated application, pursuant to Section 7(c) of the Natural Gas Act (NGA) and Part 157 of the Commission's Rules and Regulations to amend its certificate issued on May 18, 2006, as amended on January 11, 2007 and October 23, 2007 authorizing Transco's Leidy to Long Island Expansion Project. The application is on file with the Commission and open for public inspection. This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866)208-3676, or for TTY, contact (202) 502-8659.
Transco requests authorization to allow either of the existing compressor units at Compressor Station 207, each of which is currently certificated at 5,000 horsepower, to be operated up to 7,000 horsepower. This increase will not change the total horsepower used at Station 207 of 10,000 horsepower as certificated. The proposed operational change will not involve any construction activities or result in any incremental transportation capacity. No additional costs will be incurred.
Any questions regarding the application are to be directed to Scott Turkington, Director, Rates and Regulatory, Transcontinental Gas Pipe Line Corporation, P.O. Box 1396, Houston, Texas 77251-1396; phone number (713) 215-3391 or scott.c.turkington@williams.com.
Pursuant to section 157.9 of the Commission's regulations, 18 CFR 157.9, within 90 days of this Notice, the Commission's staff will either complete its environmental assessment (EA) and place it into the Commission's public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission's staff issuance of the EA for this proposal. The filing of the EA in the Commission's public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify Federal and State agencies of the timing for the completion of all necessary reviews, and the subsequent need to reach a final decision on a request for Federal authorization within 90 days of the date of issuance of the Commission staff's EA.
There are two ways to become involved in the Commission's review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding.
However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission's rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest.
Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission's environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission's environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission's final order.
The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the “eFiling” link at http://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the “e-Filing” link.
Comment Date: December 8, 2010.
Start SignatureKimberly D. Bose,
Secretary.
[FR Doc. 2010-30251 Filed 11-30-10; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Comments Received:
- 0 Comments
- Effective Date:
- 12/8/2010
- Published:
- 12/01/2010
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2010-30251
- Dates:
- December 8, 2010.
- Pages:
- 74710-74710 (1 pages)
- Docket Numbers:
- Docket No. CP11-38-000
- EOCitation:
- of 2010-11-24
- PDF File: