2011-12850. Federal Acquisition Regulation; Federal Acquisition Circular 2005-52; Introduction  

  • Start Preamble Start Printed Page 31394

    AGENCY:

    Department of Defense (DoD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA).

    ACTION:

    Summary presentation of final and interim rules.

    SUMMARY:

    This document summarizes the Federal Acquisition Regulation (FAR) rules agreed to by DoD, GSA, and NASA in this Federal Acquisition Circular (FAC) 2005-52. A companion document, the Small Entity Compliance Guide (SECG), follows this FAC. The FAC, including the SECG, is available via the Internet at http://www.regulations.gov.

    DATES:

    For effective dates and comment dates, see separate documents, which follow.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    The analyst whose name appears in the table below in relation to each FAR case. Please cite FAC 2005-52 and the specific FAR case numbers. For information pertaining to status or publication schedules, contact the Regulatory Secretariat at (202) 501-4755.

    List of Rules in FAC 2005-52

    ItemSubjectFAR caseAnalyst
    ISustainable Acquisition2010-001Clark.
    IIContract Closeout2008-020McFadden.
    IIIProhibition on Contracting with Inverted Domestic Corporations2008-009Davis.
    IVBuy American Exemption for Commercial Information Technology—Construction Material2009-039Davis.
    VOversight of Contractor Ethics Programs2010-017Robinson.
    VITechnical Amendments
    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Summaries for each FAR rule follow. For the actual revisions and/or amendments made by these FAR cases, refer to the specific item numbers and subject set forth in the documents following these item summaries. FAC 2005-52 amends the FAR as specified below:

    Item I—Sustainable Acquisition (FAR Case 2010-001) (Interim)

    This interim rule amends the FAR to implement Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management. It requires Federal agencies to leverage agency acquisitions to foster markets for sustainable technologies, materials, products, and services. Federal agencies are additionally required to implement high-performance sustainable building design, construction, renovation, repair, commissioning, operation and maintenance, management, and deconstruction practices in applicable acquisitions. Contractors will be required to support the goals of an agency's environmental management system.

    Item II—Contract Closeout (FAR Case 2008-020)

    This final rule amends the FAR procedures for closing out contracts. A proposed rule was published August 20, 2009. This rule revises procedures and sets forth a timeframe for clearing final patent reports; updates quick-closeout procedures, including applicable thresholds; sets forth a description of an adequate final indirect cost rate proposal and supporting data; and adds language for withholding fees to protect the Government's interest and encourage timely submissions of an adequate final indirect cost rate proposal. The rule does not impose any additional requirements on small businesses.

    Item III—Prohibition on Contracting With Inverted Domestic Corporations (FAR Case 2008-009)

    This final rule implements section 740 of Division C of the Consolidated Appropriations Act, 2010 (Pub. L. 111-117) and similar restrictions in 2008 and 2009 appropriations acts, which prohibit the award of contracts using appropriated funds to any foreign incorporated entity that is treated as an inverted domestic corporation or to any subsidiary of one, except as permitted in specific exceptions as set forth in the rule. The rule does not impose any requirements on small businesses.

    Item IV—Buy American Exemption for Commercial Information Technology—Construction Material (FAR Case 2009-039)

    This rule adopts as final, without change, an interim rule. The interim rule amended the FAR to implement section 615 of Division C, Title VI, of the Consolidated Appropriations Act, 2010 (Pub. L. 111-117). Section 615 authorizes exemption from the Buy American Act for acquisition of information technology that is a commercial item.

    Item V—Oversight of Contractor Ethics Programs (FAR Case 2010-017)

    This final rule modifies FAR 42.302, Contract Administration Functions, to add to the list of contract administration functions, the function of ensuring that contractors have implemented FAR 52.203-13, Contractor Code of Business Ethics and Conduct.

    Contracting officers may ask to see a contractor's code of ethics or a contractor's ethics program, but the contracting officer is not required to ask for a copy of any documents.

    Item VI—Technical Amendments

    Editorial changes are made at FAR 52.212-3, 53.301-1447, 53.301-1449, and 52.302-347.

    Start Signature

    Dated: May 18, 2011.

    Millisa Gary,

    Acting Director, Office of Governmentwide Acquisition Policy.

    End Signature

    Federal Acquisition Circular (FAC) 2005-52 is issued under the authority of the Secretary of Defense, the Administrator of General Services, and the Administrator for the National Aeronautics and Space Administration.

    Unless otherwise specified, all Federal Acquisition Regulation (FAR) Start Printed Page 31395and other directive material contained in FAC 2005-52 is effective May 31, 2011, except for Items II and V which are effective June 30, 2011.

    Start Signature

    Dated: May 18, 2011.

    Shay D. Assad,

    Director, Defense Procurement and Acquisition Policy.

    Dated: May 17, 2011.

    Joseph A. Neurauter,

    Senior Procurement Executive/Deputy CAO, Office of Acquisition Policy, U.S. General Services Administration.

    Dated: May 17, 2011.

    William P. McNally,

    Assistant Administrator for Procurement, National Aeronautics and Space Administration.

    End Signature End Supplemental Information

    [FR Doc. 2011-12850 Filed 5-27-11; 8:45 am]

    BILLING CODE 6820-EP-P

Document Information

Comments Received:
0 Comments
Published:
05/31/2011
Department:
National Aeronautics and Space Administration
Entry Type:
Rule
Action:
Summary presentation of final and interim rules.
Document Number:
2011-12850
Dates:
For effective dates and comment dates, see separate documents, which follow.
Pages:
31393-31395 (3 pages)
Docket Numbers:
Docket FAR 2011-0076, Sequence 4
PDF File:
2011-12850.pdf
CFR: (1)
48 CFR None