    This annual report is submitted in accordance with Section 1866 of the Trade and Globalization Adjustment Assistance Act (TGAAA) of 2009, which was included as subtitle I (letter “I”) of title I of Division B of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5, 123 Stat. 115, at 367). Section 1866 of the TGAAA directs the Secretary of Commerce to submit to Congress an annual report on the Trade Adjustment Assistance for Firms (TAAF) Program by the 15th of December each year. The TAAF Program is one of four Trade Adjustment Assistance (TAA) Programs authorized by the Trade Act of 1974 (19 U.S.C. 2341 et seq.) (Trade Act).

    Administered by the Department of Commerce's Economic Development Administration (EDA), the goal of the TAAF Program is to help economically distressed U.S. businesses develop strategies to compete in the global economy. In general, the program provides cost-sharing technical assistance to eligible businesses to create and implement targeted business recovery plans, called Adjustment Proposals under the program. Firms contribute a matching share to create and implement their plan.

    Technical assistance is provided through a nationwide network of eleven EDA-funded Trade Adjustment Assistance Centers (TAACs), which are either non-profits or university-affiliated. The TAACs provide assistance to firms petitioning EDA for certification of eligibility under the program and in the development and implementation of business recovery plans.

    Firms that completed the TAAF Program in FY 2008 report that at completion, average sales were $10.3 million, average employment was 73, and average productivity was $140,977 (sales per employee). One year after completing the program (FY 2009), firms report that average sales increased by one percent, average employment decreased by 10 percent, and average productivity increased by 11 percent. The Bureau of Labor Statistics (BLS) reported that nationwide for the manufacturing industry in FY 2009, average employment decreased 12 percent and average productivity increased by 4 percent. Two years after completing the program (FY 2010), firms report that average sales decreased by 14 percent, average employment decreased by 16 percent, and average productivity increased by 3 percent. BLS reported that nationwide for the manufacturing industry in FY 2010, average employment decreased 12 percent and average productivity increased by 9 percent.

    Overall, there has been an increase in the demand for the TAAF Program in FY 2010, as demonstrated by the increase in the number of petitions for certification and Adjustment Proposals submitted to EDA for approval. In FY 2010, EDA approved an additional 114 petitions, a 53 percent increase as compared to FY 2009; and approved an additional 93 Adjustment Proposals, a 54 percent increase as compared to FY 2009.

    The addition of TAAF staff resources facilitated EDA's ability to improve processing time for petitions and Adjustment Proposals in FY 2010. Although there was a spike in petitions and Adjustment Proposals, EDA successfully met the 40-day processing deadline to make a final determination for petitions accepted for filing; and the 60-day processing deadline for approval of Adjustment Proposals as required in the TGAAA. In fact, the average processing time for petitions has started to decline below the 40-day requirement and the average processing time for Adjustment Proposals is below 30 days.

    ADDRESSES:

    Trade Adjustment Assistance for Firms Division, Room D100, Economic Development Start Printed Page 4615Administration, U.S. Department of Commerce, Washington, DC 20230.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Bryan Borlik, Director of the TAAF Program, 202-482-3901.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Table of Contents

    Introduction

    Program Description

    Program Initiative

    Results/Findings

    Data for This Report

    (1) The Number of Firms That Inquired About the Program

    (2) The Number of Petitions Filed Under Section 251

    (3) The Number of Petitions Certified and Denied

    (4) The Average Time for Processing Petitions

    (5) The Number of Petitions Filed and Firms Certified for Each Congressional District of the United States

    (6) The Number of Firms That Received Assistance in Preparing Their Petitions

    (7) The Number of Firms That Received Assistance Developing Business Recovery Plans (Adjustment Proposals)

    (8) The Number of Adjustment Proposals Approved and Denied by the Secretary of Commerce

    (9) Sales, Employment, and Productivity at Each Firm Participating in the Program at the Time of Certification

    (10) Sales, Employment, and Productivity at Each Firm Upon Completion of the Program and Each Year for the Two-Year Period Following Completion

    (11) The Financial Assistance Received by Each Firm Participating in the Program

    (12) The Financial Contribution Made by Each Firm Participating in the Program

    (13) The Types of Technical Assistance Included in the Adjustment Proposals of Firms Participating in the Program

    (14) The Number of Firms Leaving the Program Before Completing the Project or Projects in Their Adjustment Proposals and the Reason the Project Was Not Completed

    Conclusion

    Introduction

    This report is provided in compliance with Section 1866 of the Trade and Globalization Adjustment Assistance Act (TGAAA) of 2009, which was included as subtitle I (letter “I”) of title I of Division B of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5, 123 Stat. 115, at 367). Section 1866 of the TGAAA directs the Secretary of Commerce to provide an annual report on the Trade Adjustment Assistance for Firms (TAAF) program by the 15th of December each year. Section 1866 of the TGAAA states:

    IN GENERAL.—Not later than December 15, 2009, and each year thereafter, the Secretary of Commerce shall prepare a report containing data regarding the trade adjustment assistance for firms program provided for in chapter 3 of title II of the Trade Act of 1974 (19 U.S.C. 2341 et seq.) for the preceding fiscal year.

    This report will provide findings and results to the extent that the data is available on the following 14 measures:

    1. The number of firms that inquired about the program.

    2. The number of petitions filed under section 251.

    3. The number of petitions certified and denied.

    4. The average time for processing petitions.

    5. The number of petitions filed and firms certified for each congressional district of the United States.

    6. The number of firms that received assistance in preparing their petitions.

    7. The number of firms that received assistance developing business recovery plans (Adjustment Proposals).

    8. The number of Adjustment Proposals approved and denied by the Secretary of Commerce.

    9. Sales, employment, and productivity at each firm participating in the program at the time of certification.

    10. Sales, employment, and productivity at each firm upon completion of the program and each year for the two-year period following completion.

    11. The financial assistance received by each firm participating in the program.

    12. The financial contribution made by each firm participating in the program.

    13. The types of technical assistance included in the Adjustment Proposals of firms participating in the program.

    14. The number of firms leaving the program before completing the project or projects in their Adjustment Proposals and the reason the project was not completed.

    Program Description

    The TAAF program is one of four Trade Adjustment Assistance (TAA) programs authorized under the Trade Act of 1974 (19 U.S.C. 2341 et seq.) (Trade Act). The responsibility for administering the TAAF program is delegated by the Secretary of Commerce to the Economic Development Administration (EDA). TAAF program provides technical assistance to manufacturers and service firms affected by import competition to help the firms develop and implement projects to regain global competitiveness.

    The mission of the TAAF Program is to help U.S. firms regain competitiveness in the global economy. Import-impacted U.S. manufacturing, production, and service firms can receive matching funds for projects that expand markets, strengthen operations, and sharpen competitiveness through TAAF. The program provides assistance in the development of business recovery plans, which are known as Adjustment Proposals under Section 252 of the Trade Act, and matching funds to implement projects outlined in the Adjustment Proposals.

    The TAAF Program supports a national network of 11 non-profit or university-affiliated Trade Adjustment Assistance Centers (TAACs) to help U.S. manufacturing, production, and service firms in all fifty states, the District of Columbia, and the Commonwealth of Puerto Rico. Firms work with the TAACs to apply for certification for TAAF assistance, and prepare and implement strategies to guide their economic recovery.

    The other TAA programs are TAA for Workers, Farmers, and Communities, which are administered by the Departments of Labor, Agriculture, and Commerce through EDA, respectively.

    Exhibit 1: TAA Programs

    Start Printed Page 4616

    Program Initiative

    As noted above, the TAAF Program provides technical assistance in the development and implementation of Adjustment Proposals. Projects are aimed at improving a firm's competitive position. Specifically, funds are applied toward the cost of consultants, engineers, designers, or industry experts for improvement projects in targeted areas that can better a firm's position, such as engineering, information technology, management, market development, marketing, new product development, quality improvement, and sales. Funds are not provided directly to firms; instead EDA funds TAACs and TAACs pay a cost-shared proportion of the cost to secure specialized business consultants.

    To certify a firm as eligible to apply for adjustment assistance, the Secretary must determine that three conditions are met:

    1. A significant number or proportion of the workers in the firm have been or are threatened to be totally or partially separated;

    2. Sales and/or production of the firm have decreased absolutely, or sales and/or production of an article or service that accounted for at least 25 percent of total production or sales of the firm during the 12, 24, or 36 months preceding the most recent 12, 24, or 36-month period for which data are available have decreased absolutely; and

    3. Increased imports of articles like or directly competitive with articles produced or services provided by the firm have “contributed importantly” to both the layoffs and the decline in sales and/or production.

    Exhibit 2: TAACs and Their Respective Service Areas

    Start Printed Page 4617

    The main responsibilities of the TAACS include:

    • Assisting firms in preparing their petitions for TAAF. Firms are not charged for any assistance related to preparing a petition.
    • Once a petition has been approved, TAACs work closely with firm management to identify the firm's strengths and weaknesses and develop a customized Adjustment Proposal designed to stimulate recovery and growth. The program pays up to 75% of the cost of developing an Adjustment Proposal and the firm must pay the rest. EDA must approve all Adjustment Proposals to ensure they conform to statutory and regulatory requirements.
    • After an Adjustment Proposal has been approved, company management and TAAC staff jointly identify consultants with the specific expertise required to assist the firm.
    • Under the TAAF Program, EDA shares the cost of Adjustment Proposal task implementation. For an Adjustment Proposal in which proposed tasks total $30,000 or less, EDA will provide 75 percent of the cost and the firm is responsible for the balance. For an Adjustment Proposal in which proposed tasks total over $30,000, EDA and the firm share the implementation costs evenly; EDA pays 50 percent of the total cost and the firm pays 50 percent. Due to limited program funding, EDA limits its share of technical assistance to a certified firm to $75,000. After a competitive procurement process, the TAAC and the firm generally contract with private consultants to implement the Adjustment Proposal.

    There are three main phases to receiving technical assistance under the program. The phases are (1) petitioning for certification, (2) recovery planning, and (3) project implementation.

    Exhibit 3: Program Phases

    Start Printed Page 4618

    Phase I—Petitioning for Certification

    The first step to receiving assistance is the submission of a petition to EDA to be certified as a trade impacted firm. This petition is Form ED-840P “Petition by a Firm for Certification of Eligibility to Apply for Trade Adjustment Assistance” and any supporting documentation. Certification specialists within the TAACs generally work with the firm at no cost to complete and submit a petition to EDA.

    Upon receipt of the petition, EDA performs a thorough analysis of the petition and supporting documents to determine if the petition is complete and may be accepted. EDA is required to make a final determination on the petition within 40 days of accepting a petition.[1]

    Phase II—Recovery Planning

    Certified firms then work with TAAC staff to develop a customized Adjustment Proposal and submit to EDA for approval. Once an Adjustment Proposal has been submitted, EDA is required to make a final determination within 60 days.

    Phase III—Adjustment Proposal Implementation

    The firm works with consultants to implement projects in an approved Adjustment Proposal. As projects are implemented and if the firm is satisfied with the work, the firm will first pay their match to the consultant, and then send a notice to the TAAC stating that they are satisfied with the work and that they have paid their matching share. The TAAC will then pay the Federal matching share. Firms have up to five years from the date of an Adjustment Proposal's approval to implement it, unless they receive approval for an extension. Generally, firms complete the implementation of their Adjustment Proposals over a two-year period.

    Results/Findings

    Data for This Report

    The data used in this report was collected from the TAACs as part of their reporting requirements, petitions for certification, and the Adjustment Proposals submitted by the TAACs on behalf of firms. Data from these sources were recorded into a central database by Eligibility Reviewers at EDA. Results for average processing times and the number of approved and denied petitions and Adjustment Proposal were derived by EDA.

    (1) The Number of Firms That Inquired About the Program

    In FY 2010, TAACs received 3,446 inquiries about the TAAF Program.

    Exhibit 4: Inquiries about the TAAF Program by TAAC

    TAACNumber of firms that inquired about the TAAF Program
    Great Lakes106
    Mid-America137
    MidAtlantic376
    Midwest82
    New England163
    New York State134
    Northwest806
    Rocky Mountain351
    Southeastern42
    Southwest280
    Western969
    Total3,446

    (2) The Number of Petitions Filed Under Section 251

    (3) The Number of Petitions Certified and Denied

    (4) The Average Time for Processing Petitions

    In FY 2010, 305 petitions were filed under Section 251 of the Trade Act, up an additional 27 petitions, a 10 percent increase compared to the number of petitions filed in FY 2009. EDA certified 330 petitions, up an additional 114 petitions, a 53 percent increase compared to the number of certifications in FY 2009. Petitions are certified on a rolling basis throughout the year. Petitions certified in FY 2010 may be the result of those filed or accepted in FY 2009; and petitions filed or accepted in FY 2010 may not result in certification in FY 2010.

    The addition of TAAF staff resources facilitated EDA's ability to improve processing time for petitions in FY 2010. Although there was a spike in petitions, EDA successfully met the 40-day processing deadline to make a final determination for petitions accepted for Start Printed Page 4619filing as required in the TGAAA. In fact, the average processing time for petitions has started to decline below the 40-day requirement.

    Exhibit 5: Petition Activity: FY 2008-FY 2010

    FYNumber of petitions filedNumber of petitions accepted for filingNumber of petitions certifiedNumber of petitions deniedAverage days between acceptance and certificationAverage days between filing and certification
    2008189190188045N/A
    200927824421614489
    201030532533004074
    % Change (2009 to 2010)10%33%53%N/A(9)%(17)%

    Exhibit 6: Petitions Filed by TAAC: FY 2008-FY 2010

    Exhibit 7: Petitions Accepted by TAAC: FY 2008-FY 2010

    Exhibit 8: Petitions Certified by TAAC: FY 2008-FY 2010

    Start Printed Page 4620

    Exhibit 9: Petitions Filed, Accepted and Certified by TAAC: FY 2010 2

    TAACNumber of petitions filed 2Number of petitions accepted for filing 2Number of petitions certified
    Great Lakes141619
    Mid-America263028
    MidAtlantic575958
    Midwest333640
    New England535656
    New York State222625
    Northwest192221
    Rocky Mountain171618
    Southeastern333030
    Southwest232523
    Western81212
    Total305328330

    Exhibit 10: Petitions Filed, Accepted, and Certified by TAAC: FY 2010

    Start Printed Page 4621

    Exhibit 11: Firms Certified for TAAF by Industry: FY 2010

    The majority of petitions certified for TAAF were submitted by firms in the manufacturing industry. Firms in wholesale trade and technical services rounded out the top three industries. Approximately 7 percent of firms certified in FY 2010 were service sector firms. Demand from service firms in FY 2011 is likely to increase at the same rate as FY 2010.

    (5) The Number of Petitions Filed and Firms Certified for Each Congressional District of the United States

    Exhibit 12: Petitions Filed by Congressional District: FY 2010

    Congressional district(s)No. of petitions filed
    AK
    At Large1
    AL
    41
    AR
    11
    24
    32
    AZ
    51
    61
    CA
    131
    301
    321
    341
    431
    CO
    12
    22
    33
    41
    51
    CT
    12
    22
    51
    61
    FL
    101
    211
    221
    241
    GA
    22
    51
    61
    71
    91
    HI
    11
    ID
    13
    IL
    32
    41
    53
    63
    81
    101
    131
    144
    161
    171
    IN
    21
    71
    81
    131
    KS
    12
    22
    31
    42
    KY
    11
    22
    31
    LA
    22
    33
    61
    71
    MA
    14
    33
    43
    53
    63
    73
    94
    102
    MD
    Start Printed Page 4622
    21
    41
    ME
    13
    23
    MI
    11
    71
    92
    113
    121
    MN
    32
    41
    51
    61
    71
    MO
    11
    21
    41
    52
    61
    74
    82
    MS
    11
    MT
    At Large3
    NC
    72
    81
    91
    101
    111
    121
    ND
    13
    NH
    14
    NJ
    81
    121
    NY
    11
    31
    82
    202
    221
    256
    264
    271
    282
    292
    OH
    41
    141
    161
    OK
    15
    21
    33
    OR
    31
    42
    PA
    33
    41
    52
    61
    73
    82
    92
    102
    118
    121
    132
    158
    163
    176
    181
    196
    RI
    18
    23
    SC
    22
    31
    53
    62
    SD
    At Large1
    TN
    41
    61
    TX
    31
    124
    131
    151
    UT
    11
    21
    31
    VA
    41
    61
    VT
    11
    WA
    41
    52
    62
    72
    92
    WI
    11
    41
    54
    62
    71

    Exhibit 13: Petitions Certified by Congressional District: FY 2010

    Congressional district(s)No. of petitions certified
    AK
    At Large2
    AL
    41
    AR
    11
    24
    32
    AZ
    41
    CA
    71
    201
    261
    301
    311
    321
    341
    431
    481
    CO
    11
    22
    33
    41
    51
    61
    CT
    12
    22
    51
    61
    FL
    101
    221
    241
    GA6
    22
    31
    51
    61
    91
    HI
    12
    IA
    31
    ID
    13
    IL
    32
    42
    53
    64
    71
    82
    101
    131
    145
    161
    171
    IN
    21
    71
    81
    131
    KS
    12
    21
    31
    42
    KY
    11
    31
    LA
    22
    32
    61
    71
    MA
    14
    34
    43
    53
    63
    73
    95
    102
    MD
    21
    Start Printed Page 4623
    41
    ME
    13
    23
    MI
    11
    71
    92
    101
    114
    121
    MN
    22
    31
    41
    51
    61
    MO
    12
    21
    31
    42
    52
    61
    75
    81
    MS
    11
    MT
    At Large5
    NC
    11
    51
    72
    91
    102
    111
    121
    ND
    11
    At Large1
    NH
    15
    21
    NY
    11
    31
    81
    203
    256
    265
    271
    284
    293
    OH
    31
    41
    81
    101
    141
    161
    OK
    15
    22
    32
    OR
    31
    42
    PA
    33
    41
    63
    74
    82
    92
    103
    117
    121
    131
    158
    162
    177
    181
    198
    RI
    18
    23
    SC
    21
    31
    52
    62
    SD
    At Large1
    TN
    41
    61
    TX
    31
    124
    151
    161
    211
    UT
    11
    21
    32
    281
    VA
    41
    62
    WA
    41
    52
    61
    73
    91
    WI
    31
    41
    55
    63

    (6) The Number of Firms that Received Assistance in Preparing Their Petitions

    In FY 2010, on average, 232 firms received assistance in preparing petitions per quarter. The total number of firms that received technical assistance varies each quarter as assistance is provided throughout the year. A firm receiving assistance in one quarter may continue to receive assistance in the following quarter.

    Exhibit 14: Petition Assistance Activity per Quarter: FY 2010

    TAACAverage No. of firms receiving assistance with preparing petitions (per quarter)
    Great Lakes8
    Mid-America61
    MidAtlantic10
    Midwest49
    New England9
    New York State15
    Northwest15
    Rocky Mountain21
    Southeastern20
    Southwest5
    Western19
    Total232

    (7) The Number of Firms That Received Assistance Developing Business Recovery Plans (Adjustment Proposals)

    In FY 2010, on average, 146 firms received assistance in developing Adjustment Proposals; and 690 firms received assistance in the implementation of Adjustment Proposal plans per quarter. The total number of firms that received technical assistance varies each quarter as assistance is provided throughout the year. A firm receiving assistance in one quarter may continue to receive assistance in the following quarter.

    Exhibit 15: Adjustment Proposal Development Activity per Quarter: FY 2010

    TAACAverage No. of firms receiving assistance with adjustment proposal development (per quarter)Average No. of firms receiving assistance with adjustment proposal implementation (per quarter)
    Great Lakes458
    Mid-America1463
    MidAtlantic1385
    Midwest1364
    New England16103
    New York State1330
    Northwest561
    Rocky Mountain1879
    Southeastern2154
    Southwest1654
    Western1339
    Total146690

    (8) The Number of Adjustment Proposals Approved and Denied by the Secretary of Commerce

    In FY 2010, EDA approved all 265 Adjustment Proposals that were submitted; an additional 93 business Start Printed Page 4624recovery plans, a 54 percent increase as compared to FY 2009.

    Exhibit 16: Summary of Adjustment Proposals Approved: FY 2008-FY 2010

    FYNumber of adjustment proposals approvedTotal government share (millions)Total firm share (millions)Total projected adjustment proposal costs (millions)Average government assistance per firm
    2008139$7.9$7.5$15.4$56,835
    2009172$10.3$9.8$20.2$59,884
    2010265$16.4$15.6$32.1$61,958
    % Change (2009 to 2010)54%59%59%59%3%

    Exhibit 17: Adjustment Proposals Approved by TAAC: FY 2008-FY 2010

    Exhibit 18: Adjustment Proposals Approved by TAAC: FY 2010

    TAACNumber of adjustment proposals approved
    Great Lakes24
    Mid-America25
    MidAtlantic29
    Midwest40
    New England48
    New York State14
    Northwest20
    Rocky Mountain17
    Southeastern23
    Southwest16
    Western9
    Total265

    (9) Sales, Employment, and Productivity at Each Firm Participating in the Program at the Time of Certification

    The average sales, employment and productivity of firms certified into the program in FY 2010 was higher than that of firms certified in FY 2009. For the purposes of this report, productivity is defined as net sales per employee. Since the certified firms are in various industries, which have a variety of ways to measure productivity, sales per employee was chosen as the productivity measure. This measure is used because it can be generally applied to all certified firms.

    Exhibit 19: Comparison of Average Sales, Employment, and Productivity at Firms at the Time of Certification: FY 2008-FY 2010

    FYAverage salesAverage employmentAverage productivity
    2008$13,081,99382$159,537
    2009$10,338,42279$130,866
    2010$19,137,139138$138,675
    % Change (2009 to 2010)85%74%15%
    Start Printed Page 4625

    Exhibit 20: Summary Comparison of Average Sales, Employment, and Productivity for Firms at the Time of Certification by TAAC: FY 2010

    TAACAverage salesAverage employmentAverage productivity
    Great Lakes$35,127,822177$198,462
    Mid-America10,265,21488116,650
    MidAtlantic15,122,65589169,917
    Midwest22,062,757114193,533
    New England7,632,08051148,649
    New York State14,585,42191160,279
    Northwest8,720,39572121,117
    Rocky Mountain43,725,204203215,395
    Southeastern11,052,02168162,530
    Southwest7,529,64536620,573
    Western34,685,316196176,966
    Total19,137,139138138,675

    Exhibit 21: Summary of Sales, Employment, and Productivity at Each Firm Participating in the Program at the Time of Certification: FY 2010

    Firm No.Sales ($)EmploymentProductivity ($)
    —2118051509$5,333,04023$231,871
    —21112495091,208,2587172,608
    —21048029262,455,4613962,961
    —21039068471,328,00010132,800
    —208345031342,874,044185231,752
    —207317563616,101,898137117,532
    —206828752211,938,99931385,129
    —205913672560,764,758181335,717
    —20238745642,518,00021119,905
    —20102361413,019,17825120,767
    —2007895508613,9066102,318
    —19978244644,171,40141102,795
    —19904578707,559,3509877,136
    —197358051045,487,13945799,534
    —19582144887,467,36949153,429
    —19563766751,780,6062474,973
    —1941157067612,1245122,425
    —18995323972,037,2574479,355
    —1898904502315,272563,054
    —18845515029,040,00058155,862
    —18808430735,265,70841128,432
    —18388777923,483,60931112,374
    —182836928517,140,309162105,804
    —17597583416,010,97150120,219
    —17421772699,976,65362160,914
    —174096009313,154,39045292,320
    —174008629126,940,727147183,270
    —17398425182,310,0682785,558
    —170471541812,875,15217175,293
    —16614851633,393,78031109,477
    —16350695917,537,00051147,784
    —15424483289,922,57812082,688
    —15207013044,697,3107761,004
    —14842229591,444,01411131,274
    —14716612056,322,00040158,050
    —146107351592,484,000302306,238
    —1454186553282,778470,695
    —14327383843,528,89033106,936
    —142733416737,484,000359104,412
    —1417226723983,0061189,364
    —12817246034,028,00038106,000
    —124343997422,596,95699228,252
    —124142711010,487,391104100,840
    —1187326382707,3414176,835
    —11690453595,046,00043117,349
    Start Printed Page 4626
    —112922383810,578,429104101,716
    —11287031111,354,6201496,759
    —11263268682,212,06419116,424
    —11169125765,470,62025218,825
    —109745935892,988,380461201,601
    —108613045026,260,884105250,509
    —103862144114,126,803103137,153
    —100432997117,601,176165106,674
    —100024043315,690,666102153,830
    —9991058492,547,00021121,286
    —9952266504,930,00024205,417
    —9479621164,549,56834133,811
    —9349755614,495,54139115,270
    —8853655633,121,6413491,813
    —85703117811,353,00099114,677
    —852461053932,3871436,520
    —8430558801,606,3943644,622
    —84016602510,585,95710997,119
    —8069449839,609,07785113,048
    —7945753051,406,8043468,935
    —78848491215,056,348108139,411
    —779297214108,005,394736146,746
    —75977948943,715,000160273,219
    —7261216341,660,14514118,582
    —70233065412,073,75112596,590
    —6925651386,173,76623268,425
    —68113974413,963,91185164,281
    —6743573475,304,00052102,000
    —67280930910,311,62928368,272
    —65490180610,811,00053203,981
    —6222077793,122,0274176,147
    —5918890872,346,2852379,900
    —58572500516,463,96185193,694
    —5603186124,131,68722190,664
    —554924474171,103357,034
    —550588573943,3481097,554
    —5438093339,295,72825371,829
    —50498995125,003,96678320,235
    —43690958911,245,91233733,371
    —429565845194,828824,354
    —426260672677,4321256,453
    —41326225816,722,097104160,789
    —3703738382,195,09014156,792
    —3568573498,882,30010584,593
    —34788271210,155,48050819,991
    —3347957662,737,5053188,307
    —3346915522,927,56325117,103
    —32524677516,232,121108150,297
    —3223891373,344,28432104,509
    —311586268939,8575187,971
    —29771618334,926,049192181,509
    —2637741284,637,86942110,425
    —2293372621,529,8151884,990
    —22271474710,140,68215764,590
    —1728769343,873,6694194,480
    —1675237701,377,0001591,800
    —13849274310,056,76635287,336
    —1265957905,781,00011649,836
    —11155793914,913,000108138,083
    —10660523894,110,272316297,817
    —803215372,496,8682888,135
    —753608883,998,95021190,426
    —7279967614,999,84267223,878
    —525730303,731,3453899,503
    —4185066920,268,68698206,823
    —24209211,191,2421391,634
    —43801832,608,321116281,106
    165732622,803,31121133,491
    221309708,378,09455152,329
    489076811,447,11711136,779
    835648721,099,8351384,603
    854745633,475,7885069,516
    920191864,882,73327180,842
    980774626,103,7256692,481
    Start Printed Page 4627
    1321070694,875,1505588,639
    2153268688,232,87710578,408
    235292569201,980,000934216,253
    278618212313,150562,630
    294844867613,2361061,324
    2993524571,090,8521477,918
    3001710062,425,84422112,830
    37000624545,317,479260174,634
    3759771283,275,98630109,200
    4163453646,160,76743114,294
    4312872266,578,24434419,123
    434352811853,0561943,972
    4477652044,050,32032126,573
    45649545022,274,28177289,276
    457871548166,600,000660252,424
    4602204795,323,86437143,888
    4619833219,815,49170140,221
    4883974643,814,82021221,798
    5076381531,168,4801483,463
    6054795073,393,7713596,965
    6955555643,774,51618209,695
    7098654562,505,1353473,680
    725507790134,197,000914146,824
    7373039637,042,58540176,065
    7425172993,196,6915261,475
    76599094611,298,809110102,716
    7692591507,770,65516485,666
    77463775114,856,71562239,624
    80799832719,015,34984622,477
    8165285069,998,09641242,085
    8217368544,502,4005778,989
    831153636884,3441306,803
    87009673310,389,47882126,701
    9164930895,939,42257104,200
    92077550013,044,54569118,878
    92199175723,726,780113209,972
    9236536412,722,00018151,222
    93108425719,809,75657347,540
    93135365813,942,05469202,059
    9367553821,990,4902482,937
    9387049289,793,61212677,727
    9522230013,371,52131108,759
    9743235667,510,8467896,293
    9984189624,612,00035131,771
    10089934171,065,2562150,726
    103667324286,665,926458189,227
    104754491212,706,34816776,086
    1079241463639,5884159,897
    108010015413,493,31786156,899
    115730681323,214,000204113,794
    11709951231,954,47613150,344
    11767045961,551,9852368,369
    119031484016,885,82980820,898
    11907251896,360,1426893,532
    119999673712,773,63466193,540
    12087922262,043,8502197,326
    123799843614,291,766134106,655
    124603389615,392,00058265,379
    124628511511,261,30361184,612
    124630211440,310,044311512,941
    12468925835,306,22543123,401
    12471538197,454,73663118,329
    124716794957,390,191259221,584
    1247662700105,504,196395267,099
    1247670190112,370,000998112,595
    1247750161158,893439,723
    12477583415,834,2486885,798
    12477660355,108,38534150,247
    12494811841,492,25612124,355
    12500227157,189,9557694,605
    125010343528,962,384187154,879
    12501057144,800,0005390,566
    125017477620,457,000124164,976
    125018687688,739,000333266,483
    Start Printed Page 4628
    1250192980433,6324108,408
    12502577543,281,3524180,033
    12513024504,018,65040100,466
    1252079576110,491,969497222,318
    1252436282217,0352108,518
    125372027214,816,33577192,420
    1254322240100,962,620320315,508
    1255105505465,216593,043
    12563211891,731,6462086,582
    12567681522,917,6263485,813
    125681984452,569,607195269,588
    12568296965,821,4376293,894
    1256861475511,9014127,975
    12569211297,230,79124301,283
    12573765091,926,7152577,378
    125751657410,874,00099109,838
    12587432228,813,26242209,840
    12608260681,978,5842289,936
    126295968215,889,75386184,765
    12647232823,640,00020182,000
    12663398616,975,56645155,013
    126635328111,331,68613583,938
    1266507166640,737971,193
    12668578851,625,0001985,526
    12669428297,291,00011861,788
    126694312116,868,347115146,173
    12669472701,876,1453258,630
    12670277151,656,6382957,622
    1267462374663,9201066,392
    126747006810,547,26976138,780
    12675434586,961,3349077,348
    12676480763,323,14126127,813
    126765197610,210,35171143,808
    126808606410,016,00034294,588
    12681463103,392,3844575,386
    126815742025,542,46432179,572
    12682248271,532,1118191,514
    1268670167355,324,2311143310,870
    12687445332,474,0004357,535
    12687512441,688,30816105,519
    12689257021,794,20814128,158
    126895138922,679,000152149,204
    1269004689161,938352,577
    12692690574,748,94020237,447
    12692714893,866,34030128,878
    12692916162,906,2203485,477
    126936830620,343,681108188,367
    1269436574991,0002034,882
    126995613048,092,000352136,625
    12700414842,214,35021105,045
    127005700711,118,85090123,543
    12704804986,162,6596989,314
    12704941207,701,34364120,333
    12712506268,126,1749882,920
    12712530123,574,30026137,473
    12712547872,428,44817142,850
    12714443443,399,6353889,464
    12730824441,757,2691992,488
    12731515942,636,26518146,459
    12735110653,415,9793889,894
    1273604467935,3301659,386
    12736705171,588,0749176,453
    1274280512185,2201185,220
    127437794159,439,842223266,546
    12747322534,418,36333133,890
    12748910838,212,1018992,271
    12749040437,013,00055127,509
    127497762110,041,63110793,847
    127498245324,617,949165149,200
    12754986088,194,9268299,938
    12755014818,854,43942210,820
    12755119678,679,38547186,333
    12760016191,921,00010192,100
    1276010273837,2298104,654
    Start Printed Page 4629
    12761035786,547,09843152,258
    12765226021,096,3751478,313
    12765367641,760,4047251,486
    127672069323,845,594153155,854
    1276793499912,1158114,014
    127686886990,881,308633143,572
    12768811286,249,9476596,153
    12771481724,047,4065179,361
    127732180829,153,315202144,323
    12773899381,154,43511104,949
    127783473332,327,732144225,280
    1279745224209,812,000990211,931
    12802485319,645,67348200,952
    12803272795,206,73617306,279
    12803330081,855,2021997,642
    128041396612,554,00018169,359
    12804324059,508,14973130,249
    128077833315,244,15665234,525
    12810152594,717,2205684,236
    12810191334,188,05523182,089
    12810257574,588,57531148,019
    1281031551844,7486151,389
    1281037430686,821885,853
    12811059175,609,49923243,891
    12811075142,896,91716180,157
    128205164210,719,78511196,575
    12821406864,415,04235125,534
    12884474999,275,77668136,408
    12942277251,198,4001963,074
    129507855469,520,128245283,756
    13504781647,764,98873106,735
    13645036402,604,71013200,362
    139790065120,812,20072289,058
    1438893258709,112976,661
    1442035945104,000621,677
    145619911614,937,31071210,385
    1461210273688,0015137,600
    148922882234,534,810222155,562
    150820923158,126,775247235,331
    152855400134,240,000191179,267
    15317894936,468,1846569,860
    153567441083,743,273391214,177
    15654796994,024,75531129,831
    15693205612,785,5283287,048
    16051003841,196,0611726,954
    16253767725,722,0006390,825
    1658462633191,092,628608314,297
    17390211997,540,42761123,614
    17519200524,841,3977069,163
    18669914372,250,4983662,514
    18713046061,807,14117106,302
    187422846310,409,00476136,961
    19195687751,769,5721898,310
    1974568513430,4011627,768
    19748305811,518,2251694,889
    19766031204,028,26937108,872
    199575140914,548,10425457,276
    201296934024,295,000185131,324
    204404617927,293,631110248,124
    205027033459,757,408192311,237
    207112457230,636,210212144,510
    208674830537,808,432175216,048
    210962713111,900,00075158,667

    (10) Sales, Employment, and Productivity at Each Firm Upon Completion of the Program and Each Year for the Two-year Period Following Completion

    Firms that completed the TAAF Program in FY 2008 report that at completion, average sales were $10.9 million, average employment was 73, and average productivity was $150,674 (sales per employee).

    Between FY 2008 and FY 2009, one year after completing the program, firms report that average sales increased by one percent, average employment decreased by 10 percent, and average productivity increased by 11 percent. The Bureau of Labor Statistics (BLS) reports that nationwide for the manufacturing industry, average employment decreased 12 percent and Start Printed Page 4630average productivity increased by 4 percent.

    Between FY 2008 and FY 2010, two years after completing the program, firms report that average sales decreased by 14 percent, average employment decreased by 16 percent, and average productivity increased by 3 percent. BLS reports that nationwide for the manufacturing industry, average employment decreased 12 percent and average productivity increased by 9 percent.

    For the purposes of this report, data was reported only for firms where all data was available. Since the certified firms are in various industries, which have a variety of ways to measure productivity, sales per employee was chosen as the productivity measure. This measure is used because it can be generally applied to all certified firms. However, BLS' productivity measures relate output to the labor hours used in the production of that output.

    Exhibit 22: Summary of Average Sales, Employment, and Productivity at Firms Upon Completion of the Program and the One-Year Period Following Completion

    Program completionAverage salesAverage employmentAverage productivity
    Completion (FY 2008)$10,999,20073$150,674
    1st Year Following Completion (FY 2009)$11,079,46066$167,871
    % Change 1st Year Following Completion1%−10%11%

    Exhibit 23: Summary of Average Sales, Employment, and Productivity at Firms Upon Completion of the Program and the Two-Year Period Following Completion

    Program completionAverage salesAverage employmentAverage productivity
    Completion (FY 2008)$10,999,20073$150,674
    2nd Year Following Completion (FY 2010)$9,498,47961$155,713
    % Change 2nd Year Following Completion−14%−16%3%

    Exhibit 24: Sales, Employment, and Productivity at Each Firm Upon Completion of the Program and Two-Year Period Following Completion

    Firm IDAverage sales at completion (FY 2008)Average sales 1st yr following completion (FY 2009)Average sales 2nd yr following completion (FY 2010)Average employment at completion (FY 2008)Average employment 1st yr following completion (FY 2009)Average employment 2nd yr following completion (FY 2010)Average productivity at completion (FY 2008)Average productivity 1st yr following completion (FY 2009)Average productivity 2nd yr following completion (FY 2010)
    FY08-01$39,390,601$37,698,350$21,692,925325275173$121,202$137,085$125,393
    FY08-0510,630,00010,800,0004,800,000645538166,094196,364126,316
    FY08-0328,400,00031,500,00025,150,000190180158149,474175,000159,177
    FY08-045,130,0005,800,0005,325,204333531155,455165,714171,781
    FY08-0216,500,00017,800,00017,000,000535556311,321323,636303,571
    FY08-233,000,0002,000,0002,000,000252523120,00080,00086,957
    FY08-247,500,0007,000,0007,020,687676565111,940107,692108,011
    FY08-202,000,0001,000,0002,400,00021102295,238100,000109,091
    FY08-254,200,0004,000,0004,200,000333133127,273129,032127,273
    FY08-261,700,0001,100,0001,200,000999188,889122,222133,333
    FY08-216,056,4585,500,0003,006,918273121224,313177,419143,187
    FY08-283,070,0003,080,0002,300,000191815161,579171,111153,333
    FY08-2210,200,0009,000,00010,000,000585557175,862163,636175,439
    FY08-2718,750,00017,000,00018,500,000868085218,023212,500217,647
    FY08-30275,000248,000229,00068745,83331,00032,714
    FY08-29313,000416,000533,00022121214,22734,66744,417
    FY08-343,081,0002,220,0001,597,00039252279,00088,80072,591
    FY08-3117,500,00014,200,00010,900,00019516012089,74488,75090,833
    FY08-323,210,0004,273,0004,637,00036413589,167104,220132,486
    FY08-3618,592,00018,227,00016,852,000130105125143,015173,590134,816
    FY08-37354,000859,0001,117,00057670,800122,714186,167
    FY08-3330,000,00040,000,00040,000,000200100120150,000400,000333,333
    FY08-3514,300,00014,200,00013,000,000383537376,316405,714351,351
    FY08-386,500,0007,100,0008,400,000506880130,000104,412105,000
    FY08-3937,000,00040,000,00043,000,00044042943984,09193,24097,950
    FY08-417,500,0008,900,0009,400,000252931300,000306,897303,226
    FY08-408,500,00010,500,00010,750,000152528566,667420,000383,929
    FY08-44911,948881,669430,40120161145,59755,10439,127
    FY08-421,972,4251,629,361945,420181414109,579116,38367,530
    FY08-4319,493,38215,767,00019,000,000888686221,516183,337220,930
    FY08-47520,610452,662301,63586565,07675,44460,327
    FY08-494,250,0003,386,3461,818,408221915193,182178,229121,227
    FY08-57769,184816,322674,25511111069,92674,21167,426
    Start Printed Page 4631
    FY08-562,960,7193,027,5762,292,15437373380,01981,82669,459
    FY08-537,278,5836,535,8274,675,983433636169,269181,551129,888
    FY08-526,160,6776,101,3634,593,196342627181,196234,668170,118
    FY08-5441,000,00040,000,00022,500,000757075546,667571,429300,000
    FY08-5529,000,00028,000,00018,700,000200204147145,000137,255127,211
    Total10,299,20011,079,4609,498,479736661150,674167,871155,713

    (11) The Financial Assistance Received by Each Firm Participating in the Program

    (12) The Financial Contribution Made by Each Firm Participating in the Program

    In FY 2010, firms received $8.7 million in technical assistance provided by the TAACs to prepare petitions; and in the development and implementation of Adjustment Proposals (often through business consultants and other experts). Firms participating in the program contributed $6.1 million towards the development and implementation of Adjustment Proposals. Funds are not provided directly to firms; instead EDA funds TAACs and TAACs pay a cost-shared proportion of the cost to secure specialized business consultants.

    Exhibit 25: Summary of TAAF Program Financial Assistance by TAAC: FY 2010

    TAACTAAC assistance to firmsAmount paid to consultants by the TAACsTotal TAAC assistance to firms (TAACs + consultants)Financial contribution by the firms
    Great Lakes$196,060$677,560$873,620$646,809
    Mid-America93,836466,399560,235466,399
    MidAtlantic309,655910,5621,220,217910,562
    Midwest178,428705,954884,382631,906
    New England229,2491,283,1891,512,4381,256,739
    New York State152,425366,230518,655271,104
    Northwest53,257499,053552,310443,905
    Rocky Mountain493,122433,261926,383433,261
    Southeastern243,177514,935758,112495,659
    Southwest128,997453,751582,748373,376
    Western98,004183,943281,947170,524
    Total2,176,2106,494,8378,671,0476,100,244

    (13) The Types of Technical Assistance Included in the Adjustment Proposals of Firms Participating in the Program

    Firms proposed various types of projects in Adjustment Proposals. Marketing/sales projects are geared toward increasing revenue, whereas production/manufacturing projects tend to be geared toward cutting costs. Support system projects can provide a competitive advantage by either cutting costs or creating new sales channels. Management and financial projects are designed to improve management's decision making ability and business control. More than half of all firms proposed to implement marketing/sales or production/manufacturing projects. Sample projects are listed below in Exhibit 26.

    Exhibit 26: Characteristics of Technical Assistance in Adjustment Proposals: FY 2010

    Project classificationSample types of projectsNumber of adjustment proposal projectsAdjustment proposal project costs
    Financial• Accounting systems upgrade • Cost control tracking system • Automatic Data Processing development30$517,000
    Management• Strategic business planning • Succession management • Management development791,987,100
    Marketing/Sales• Sales process training • Market expansion and feasibility analysis • Web site design and upgrade22811,416,092
    Production• Lean manufacturing and certification • New product development • Production and warehouse automation21511,918,300
    Support Systems• Enterprise Resource Planning • MIS upgrades • Computer Aided Design software • Supply chain management software1626,984,400
    Start Printed Page 4632

    Exhibit 27: Adjustment Proposals by Project Classification: FY 2010

    (14) The Number of Firms Leaving the Program Before Completing the Project or Projects in Their Adjustment Proposals and the Reason the Project Was Not Completed

    In FY 2010, of the 102 firms that left the TAAF program, 57 completed the program and the remaining 45 firms left for the reasons listed below in Exhibit 28.

    Exhibit 28: Summary of Firms Leaving the TAAF Program: FY 2010

    Reason for leaving programNumber of firms
    Completed Assistance57
    Firm Filed Chapter 111
    Firm Sold2
    Inadequate Funds for Project Implementation4
    Lost Interest in Program4
    Out of Business11
    Past 5-year Threshold23
    Total102

    Conclusion

    TAAF effectively targeted small and medium sized firms FY 2010. The average sales, employment and productivity of firms certified into the program in FY 2010 was higher than that of firms certified in FY 2009. More than half of all firms proposed to implement a marketing/sales project or production/engineering project in their Adjustment Proposals.

    Firms that completed the TAAF Program in FY 2008 report that at completion, average sales were $10.3 million, average employment was 73, and average productivity was $140,977 (sales per employee). One year after completing the program (FY 2009), firms report that average sales increased by one percent, average employment decreased by 10 percent, and average productivity increased by 11 percent. BLS reported that nationwide for the manufacturing industry in FY 2009, average employment decreased 12 percent and average productivity increased by 4 percent. Two years after completing the program (FY 2010), firms report that average sales decreased by 14 percent, average employment decreased by 16 percent, and average productivity increased by 3 percent. BLS reported that nationwide for the manufacturing industry in FY 2010, average employment decreased 12 percent and average productivity increased by 9 percent.

    Overall, there has been an increase in the demand for the TAAF Program in FY 2010, as demonstrated by the increase in the number of petitions for certification and Adjustment Proposals submitted to EDA for approval. In FY 2010, EDA approved an additional 114 petitions, a 53 percent increase as compared to FY 2009; and approved an additional 93 Adjustment Proposals, a 54 percent increase as compared to FY 2009.

    The addition of TAAF staff resources facilitated EDA's ability to improve processing time for petitions and Adjustment Proposals in FY 2010. Although there was a spike in petitions and Adjustment Proposals, EDA successfully met the 40-day processing deadline to make a final determination for petitions accepted for filing; and the 60-day processing deadline for approval of Adjustment Proposals as required in the TGAAA. In fact, the average processing time for petitions has started to decline below the 40-day requirement and the average processing time for Adjustment Proposals is below 30 days.

    Start Signature

    Dated: January 20, 2011.

    Bryan Borlik,

    Director, Trade Adjustment Assistance for Firms Program.

    End Signature End Supplemental Information

    Footnotes

    1.  As of May 17, 2009, the deadline for making a final determination is 40 days. Before May 17, 2009, EDA had 60 days to make a determination.

    Back to Citation

    2.  Petitions are certified on a rolling basis throughout the year, therefore activity in these categories may not result in certification within the same FY. These totals represent the activity under each category within FY 2010.

    Back to Citation

    BILLING CODE 3510-24-P

    [FR Doc. 2011-1583 Filed 1-25-11; 8:45 am]

    BILLING CODE 3510-24-P

Document Information

Published:
01/26/2011
Department:
Economic Development Administration
Entry Type:
Notice
Action:
Notice.
Document Number:
2011-1583
Pages:
4614-4632 (19 pages)
PDF File:
2011-1583.pdf