AGENCY:
Coast Guard, DHS.
ACTION:
Final rule.
SUMMARY:
The Coast Guard has changed the drawbridge operation regulations that govern the operation of the Padanaram Bridge across the Apponagansett River, mile 1.0, at Dartmouth, Massachusetts. The owner of the bridge requested relief from crewing the bridge in the early morning hours when there have been no requests to open the bridge. It is expected that this change to the regulations would provide relief to the bridge owner while continuing to meet the reasonable needs of navigation.
DATES:
This rule is effective November 16, 2011.
ADDRESSES:
Comments and related materials received from the public, as well as documents mentioned in this preamble as being available in the docket, are part of docket USCG-2011-0335 and are available online by going to http://www.regulations.gov,, inserting USCG-2011-0335 in the “Keyword” box, and then clicking “Search.” This material is also available for inspection or copying at the Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
If you have questions on this rule, call or e-mail Mr. John McDonald, Project Officer, First Coast Guard District Bridge Branch, 617-223-8364, john.w.mcdonald@uscg.mil. If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202-366-9826.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Regulatory Information
On June 24, 2011, we published a notice of proposed rulemaking (NPRM) entitled Drawbridge Operation Regulations Apponagansett River, in the Federal Register (76 FR 37041). We received no comments in response to the proposed rule. No public meeting was requested, and none was held.
Basis and Purpose
The Padanaram Bridge across the Apponagansett River, mile 1.0, at Dartmouth, Massachusetts, has a vertical clearance in the closed position of 9 feet at mean high water and 12 feet at mean low water. The drawbridge operation regulations are listed at 33 CFR 117.587.
The existing drawbridge operation regulations require the draw to open on signal 1 May through 31 October from 5 a.m. to 9 p.m., daily. The following intervals apply to open on signal: The bridge shall open on signal, twice an hour, on the hour and the half hour between 5 a.m. and 9 a.m. and between 8 p.m. and 9 p.m or on signal, once an hour, on the hour between 9 a.m. and 8 p.m. At all other times the bridge shall open if at least four hours advance notice is given.
The Coast Guard received a request from the owner of the bridge, the Town of Dartmouth, to change the drawbridge operation regulations concerning the daily hours the bridge is crewed from 1 May through 31 October. The bridge owner requested to crew the bridge from 6 a.m. through 9 p.m. instead of 5 a.m. through 9 p.m., daily.
A review of the bridge opening logs reveals that the bridge has not received any requests to open between 5 a.m. and 6 a.m. since 2009.
As a result of the above information the Coast Guard believes it is reasonable for the bridge owner to crew the Padanaram Bridge from 6 a.m. through 9 p.m., 1 May through 31 October, since there have been no requests to open the bridge before 6 a.m.
Discussion of Comments and Changes
The Coast Guard received no comments in response to the notice of proposed rulemaking. As a result no changes were made to this final rule.
Regulatory Analyses
We developed this rule after considering numerous statutes and executive orders related to rulemaking. Below we summarize our analyses based on 13 of these statutes or executive orders.
Executive Order 12866 and Executive Order 13563
This rule is not a significant regulatory action under section 3(f) of Executive Order 12866, Regulatory Planning and Review, as supplemented by Executive Order 13563, and does not require an assessment of potential costs and benefits under section 6(a)(3) of that Order. The Office of Management and Budget has not reviewed it under that Order. There will not be a significant impact. This conclusion is based on the fact that the bridge has not received any requests to open between 5 a.m. and 6 a.m., daily, between May 1 and October 31.
Small Entities
Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we have considered whether this rule would have a significant economic impact on a substantial number of small entities. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000.
The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities. This rule would affect the following entities, some of which might be small entities: the owners or operators of vessels needing to transit through the bridge between 1 May through 31 October from 5 a.m. to 6 a.m. This rule would not have a significant economic impact on a substantial number of small entities for the following reason:
The bridge has not received any requests to open between 5 a.m. and 6 a.m., daily, between 1 May and 31 October, since 2009.
Assistance for Small Entities
Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), in the NPRM we offered to assist small entities in understanding the rule so that they could better evaluate its effects on them and participate in the rulemaking process.
Collection of Information
This rule calls for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).
Federalism
A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on State or local governments and would either preempt State law or impose a substantial direct cost of compliance on them. We have analyzed this rule under that Order and have determined that it does not have implications for federalism.Start Printed Page 64010
Unfunded Mandates Reform Act
The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or Tribal government, in the aggregate, or by the private sector of $100,000,000 (adjusted for inflation) or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.
Taking of Private Property
This rule will not cause a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.
Civil Justice Reform
This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminates ambiguity, and reduce burden.
Protection of Children
We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and would not create an environmental risk to health or risk to safety that might disproportionately affect children.
Indian Tribal Governments
This rule does not have Tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have a substantial direct effect on one or more Indian Tribes, on the relationship between the Federal Government and Indian Tribes, or on the distribution of power and responsibilities between the Federal Government and Indian Tribes.
Energy Effects
We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a “significant energy action” under that order because it is not a “significant regulatory action” under Executive Order 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. The Administrator of the Office of Information and Regulatory Affairs has not designated it as a significant energy action. Therefore, it does not require a Statement of Energy Effects under Executive Order 13211.
Technical Standards
The National Technology Transfer and Advancement Act (NTTAA) (15 U.S.C. 272 note) directs agencies to use voluntary consensus standards in their regulatory activities unless the agency provides Congress, through the Office of Management and Budget, with an explanation of why using these standards would be inconsistent with applicable law or otherwise impractical. Voluntary consensus standards are technical standards (e.g., specifications of materials, performance, design, or operation; test methods; sampling procedures; and related management systems practices) that are developed or adopted by voluntary consensus standards bodies.
This rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards.
Environment
We have analyzed this rule under Department of Homeland Security Management Directive 023-01 and Commandant Instruction M16475.lD, which guides the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have concluded that this action is one of a category of actions which do not individually or cumulatively have a significant effect on the human environment. This rule is categorically excluded, under figure 2-1, paragraph (32)(e), of the Instruction.
Under figure 2-1, paragraph (32)(e), of the Instruction, an environmental analysis checklist and a categorical exclusion determination are not required for this rule.
Start List of SubjectsList of Subjects in 33 CFR Part 117
- Bridges
For the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 117 as follows:
Start PartPART 117—DRAWBRIDGE OPERATION REGULATIONS
End Part Start Amendment Part1. The authority citation for part 117 continues to read as follows:
End Amendment Part Start Amendment Part2. In § 117.587, revise paragraphs (a) introductory text and (a)(1) to read as follows:
End Amendment PartApponagansett River.(a) The draw of the Padanaram Bridge, mile 1.0, shall open on signal from 1 May through 31 October, between 6 a.m. and 9 p.m., daily, as follows:
(1) The bridge shall open on signal, twice an hour, on the hour and half hour between 6 a.m. and 9 a.m. and between 8 p.m. and 9 p.m.
* * * * *Dated: September 16, 2011.
Daniel A. Neptun,
Rear Admiral, U.S. Coast Guard, Commander, First Coast Guard District.
[FR Doc. 2011-26545 Filed 10-14-11; 8:45 am]
BILLING CODE 9110-04-P
Document Information
- Comments Received:
- 0 Comments
- Effective Date:
- 11/16/2011
- Published:
- 10/17/2011
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Final rule.
- Document Number:
- 2011-26545
- Dates:
- This rule is effective November 16, 2011.
- Pages:
- 64009-64010 (2 pages)
- Docket Numbers:
- Docket No. USCG-2011-0335
- RINs:
- 1625-AA09: Drawbridge Regulations
- RIN Links:
- https://www.federalregister.gov/regulations/1625-AA09/drawbridge-regulations
- Topics:
- Bridges
- PDF File:
- 2011-26545.pdf
- CFR: (1)
- 33 CFR 117.587