-
Start Preamble
The following notice of meeting is published pursuant to section 3(a) of the Government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING:
Federal Energy Regulatory Commission.
DATE AND TIME:
March 17, 2011; 10 a.m.
PLACE:
Room 2C, 888 First Street, NE., Washington, DC 20426
STATUS:
Open.
MATTERS TO BE CONSIDERED:
Agenda.
* Note
—Items listed on the agenda may be deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission's Web site at http://www.ferc.gov using the eLibrary link, or may be examined in the Commission's Public Reference Room.
Start Signature968th—Meeting
Item No. Docket No. Company Administrative A-1 AD02-1-000 Agency Business Matters. A-2 AD02-7-000 Customer Matters, Reliability, Security and Market Operations. Electric E-1 ER03-563-066 Devon Power LLC. E-2 OMITTED. E-3 NP10-18-000 North American Electric Reliability Corporation. Start Printed Page 14007 E-4 RM09-18-001 Revision to Electric Reliability Organization Definition of Bulk Electric System. E-5 RM11-14-000 Analysis of Horizontal Market Power under the Federal Power Act. E-6 RM10-16-000 System Restoration Reliability Standards. E-7 RM10-10-000 Planning Resource Adequacy Assessment Reliability Standard. E-8 RM10-15-000 Mandatory Reliability Standards for Interconnection Reliability Operating Limits. E-9 RM09-19-000 Western Electric Coordinating Council Qualified Transfer Path Unscheduled Flow Relief Regional Reliability Standard. E-10 RR09-6-003 North American Electric Reliability Corporation. E-11 OMITTED. E-12 ER11-2256-000 California Independent System Operator Corporation. E-13 EL08-47-006 PJM Interconnection, L.L.C. E-14 EL11-12-000 Idaho Wind Partners 1, LLC. E-15 EL10-1-001 Southern California Edison Company. E-16 EL10-84-002 Californians for Renewable Energy, Inc. v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company and the California Public Utilities Commission. Gas G-1 OMITTED. G-2 RP11-1495-002 Ozark Gas Transmission, L.L.C. G-3 RP10-315-002 Columbia Gulf Transmission Company. G-4 OR07-7-000 Tesoro Refining and Marketing Company v. Calnev Pipe Line LLC. OR07-18-000 America West Airlines, Inc. and US Airways, Inc., Chevron Products Company, Continental Airlines, Inc., Southwest Airlines Co. and Valero Marketing and Supply Company v. Calnev Pipe Line LLC. OR07-19-000 ConocoPhillips Co. v. Calnev Pipe Line LLC. OR07-22-000 BP West Coast Products, LLC v. Calnev Pipe Line LLC. OR09-15-000 Tesoro Refining and Marketing Company v. Calnev Pipe Line LLC. OR09-20-000 BP West Coast Products, LLC v. Calnev Pipe Line LLC. Hydro H-1 P-2539-061 Erie Boulevard Hydropower, L.P. H-2 P-2195-025 Portland General Electric Company. H-3 P-1390-063 Southern California Edison Company. Certificates C-1 OMITTED. C-2 CP10-492-000 Columbia Gas Transmission, LLC. C-3 OMITTED. C-4 CP10-22-000 Magnum Gas Storage, LLC, Magnum Solutions, LLC. C-5 CP10-486-000 Colorado Interstate Gas Company. Issued: March 10, 2011.
Kimberly D. Bose,
Secretary.
A free Webcast of this event is available through http://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to http://www.ferc.gov's Calendar of Events and locating this event in the Calendar. The event will contain a link to its Webcast. The Capitol Connection provides technical support for the free Webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit http://www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service.
End Preamble[FR Doc. 2011-6067 Filed 3-11-11; 11:15 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 03/15/2011
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2011-6067
- Pages:
- 14006-14007 (2 pages)
- PDF File:
- 2011-6067.pdf