2012-22323. WBI Energy Transmission, Inc.; Notice of Application  

  • Start Preamble

    Take notice that on August 23, 2012, WBI EnergyTransmission, Inc. (WBI) filed in Docket No. CP12-504-000 an application pursuant to section 7 of the Natural Gas Act and Part 157 the Commission's Rules and Regulations for all the necessary authorizations required to recertify the minimum bottom hole pressure and to operate four acquired production wells as observation wells at its Elk Basin Storage Reservoir in Park County, Wyoming and Carbon County, Montana, all as more fully set forth in the application which is on file with the Commission and open to public inspection.

    Copies of this filing are available for review at the Commission in the Public Reference Room, or may be viewed on the Commission's Web site web at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TTY, (202) 502-8659.

    Questions regarding this application should be directed to Keith A. Tiggelaar, Director of Regulatory Affairs, WBI Energy Transmission, Inc., Inc., 1250 West Century Avenue, Bismarck, North Dakota 58503, telephone (701) 530-1560, email keith.tiggelaar@wbienergy.com.

    There are two ways to become involved in the Commission's review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, before the comment date of this notice, file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding.

    However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission's rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest.

    The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site (www.ferc.gov) under the “e-Filing” link. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426.

    Comment Date: September 26, 2012

    Start Signature

    Dated: September 5, 2012.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2012-22323 Filed 9-10-12; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Effective Date:
9/26/2012
Published:
09/11/2012
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2012-22323
Dates:
September 26, 2012
Pages:
55816-55816 (1 pages)
Docket Numbers:
Docket No. CP12-504-000
PDF File:
2012-22323.pdf