2015-20538. Revisions to Auxiliary Installations, Replacement Facilities, and Siting and Maintenance Regulations
-
Start Preamble
AGENCY:
Federal Energy Regulatory Commission.
ACTION:
Final rule, order on clarification; correction.
SUMMARY:
This document contains corrections to the final rule (RM12-11-003) which was published in the Federal Register of Friday, July 24, 2015 (80 FR 43944). The final rule amended regulations to: provide pre-granted authority under a new paragraph to abandon or replace auxiliary facilities, subject to certain conditions; permit auxiliary facilities that cannot meet the conditions for the pre-granted abandonment authority in the new paragraph to be abandoned under the blanket certificate regulations, subject to those regulations' requirements; and permit replacement facilities constructed under the regulations to be abandoned under the blanket certificate regulations, subject to those regulations' requirements.
DATES:
Effective October 7, 2015.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Katherine Liberty, Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, (202) 502-6491, katherine.liberty@ferc.gov.
Gordon Wagner, Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, (202) 502-8947, gordon.wagner@ferc.gov.
Howard Wheeler, Office of Energy Projects, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, (202) 502-8688, howard.wheeler@ferc.gov.
Shannon Jones, Office of Energy Projects, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, (202) 502-6410, shannon.jones@ferc.gov.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Revisions to Auxiliary Installations, Replacement Facilities, and Siting and Maintenance Regulations Docket No. RM12-11-003
Errata Notice
On July 16, 2015, the Commission issued a Final Rule in the above Start Printed Page 50559captioned proceeding. Revisions to Auxiliary Installations, Replacement Facilities, and Siting and Maintenance Regulations, 152 FERC ¶ 61,049 (2015). This errata notice makes a correction to the Final Rule as issued.
In FR Doc. 2015-17919 appearing on page 43949 in the Federal Register of Friday, July 24, 2015, the following correction is made:
1. On page 43949, in the second column, § 157.216(b)(2)(i)(A) of the regulatory text is revised to read as follows:
“(A) Will not exceed the cost limit in § 157.208(d) for activities under the prior notice provisions;”
Start SignatureDated: August 14, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-20538 Filed 8-19-15; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Effective Date:
- 10/7/2015
- Published:
- 08/20/2015
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Rule
- Action:
- Final rule, order on clarification; correction.
- Document Number:
- 2015-20538
- Dates:
- Effective October 7, 2015.
- Pages:
- 50558-50559 (2 pages)
- Docket Numbers:
- Docket No. RM12-11-003, Order No. 790-B
- PDF File:
- 2015-20538.pdf
- CFR: (2)
- 18 CFR 2
- 18 CFR 157