2016-30641. Air Plan Approval; Mississippi; Interstate Transport (Prongs 1 and 2) for the 2010 1-Hour NO2
-
Start Preamble
AGENCY:
Environmental Protection Agency (EPA).
ACTION:
Final rule.
SUMMARY:
The Environmental Protection Agency (EPA) is approving a revision to the Mississippi State Implementation Plan (SIP), submitted by the Mississippi Department of Environmental Quality, on May 23, 2016, addressing the Clean Air Act (CAA or Act) interstate transport (prongs 1 and 2) infrastructure SIP requirements for the 2010 1-hour Nitrogen Dioxide (NO2) National Ambient Air Quality Standard (NAAQS). The CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by EPA, commonly referred to as an “infrastructure SIP.” Specifically, EPA is approving Mississippi's May 23, 2016, SIP submission addressing prongs 1 and 2, Start Printed Page 93823to ensure that air emissions in the State do not significantly contribute to nonattainment or interfere with maintenance of the 2010 1-hour NO2 NAAQS in any other state.
DATES:
This rule is effective January 23, 2017.
ADDRESSES:
EPA has established a docket for these actions under Docket Identification No EPA-R04-OAR-2016-0421. All documents in the docket are listed on the www.regulations.gov Web site. Although listed in the index, some information may not be publicly available, i.e., Confidential Business Information or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through www.regulations.gov or in hard copy at the Air Regulatory Management Section, Air Planning and Implementation Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street SW., Atlanta, Georgia 30303-8960. EPA requests that if at all possible, you contact the person listed in the FOR FURTHER INFORMATION CONTACT section to schedule your inspection. The Regional Office's official hours of business are Monday through Friday 8:30 a.m. to 4:30 p.m., excluding federal holidays.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Nacosta C. Ward of the Air Regulatory Management Section, Air Planning and Implementation Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street SW., Atlanta, Georgia 30303-8960. Ms. Ward can be reached by telephone at (404) 562-9140 or via electronic mail at ward.nacosta@epa.gov.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
I. Background
By statute, SIPs meeting the requirements of sections 110(a)(1) and (2) of the CAA are to be submitted by states within three years after promulgation of a new or revised NAAQS to provide for the implementation, maintenance, and enforcement of the new or revised NAAQS. EPA has historically referred to these SIP submissions made for the purpose of satisfying the requirements of sections 110(a)(1) and 110(a)(2) as “infrastructure SIP” submissions. Sections 110(a)(1) and (2) require states to address basic SIP elements such as requirements for monitoring, basic program requirements, and legal authority that are designed to assure attainment and maintenance of the newly established or revised NAAQS. More specifically, section 110(a)(1) provides the procedural and timing requirements for infrastructure SIPs. Section 110(a)(2) lists specific elements that states must meet for the infrastructure SIP requirements related to a newly established or revised NAAQS. The contents of an infrastructure SIP submission may vary depending upon the data and analytical tools available to the state, as well as the provisions already contained in the state's implementation plan at the time in which the state develops and submits the submission for a new or revised NAAQS.
Section 110(a)(2)(D) has two components: 110(a)(2)(D)(i) and 110(a)(2)(D)(ii). Section 110(a)(2)(D)(i) includes four distinct components, commonly referred to as “prongs,” that must be addressed in infrastructure SIP submissions. The first two prongs, which are codified in section 110(a)(2)(D)(i)(I), are provisions that prohibit any source or other type of emissions activity in one state from contributing significantly to nonattainment of the NAAQS in another state (prong 1) and from interfering with maintenance of the NAAQS in another state (prong 2). The third and fourth prongs, which are codified in section 110(a)(2)(D)(i)(II), are provisions that prohibit emissions activity in one state from interfering with measures required to prevent significant deterioration of air quality in another state (prong 3) and from interfering with measures to protect visibility in another state (prong 4). Section 110(a)(2)(D)(ii) requires SIPs to include provisions ensuring compliance with sections 115 and 126 of the Act, relating to interstate and international pollution abatement.
Through this action, EPA is approving Mississippi's May 23, 2016, SIP submission addressing prong 1 and prong 2 requirements for the 2010 1-hour NO2 NAAQS. All other applicable infrastructure SIP requirements for Mississippi for the 2010 1-hour NO2 NAAQS have been addressed in separate rulemakings. See 80 FR 14019 (March 18, 2015), 81 FR 32707 (May 24, 2016), and 81 FR 33139 (May 25, 2016).
In a notice of proposed rulemaking (NPRM) published on September 28, 2016 (81 FR 66591), EPA proposed to approve Mississippi's May 23, 2016, SIP revision addressing the interstate transport requirements for the 2010 NO2 NAAQS. The NPRM provides additional detail regarding the rationale for EPA's actions, including further discussion of the requirements for prongs 1 and 2. Comments on the proposed rulemaking were due on or before October 28, 2016. EPA received no adverse comments on the proposed action.
II. Final Action
As described previously, EPA is approving approve Mississippi's May 23, 2016, SIP submission addressing prongs 1 and 2 of CAA section 110(a)(2)(D)(i) for the 2010 1-hour NO2 NAAQS.
III. Statutory and Executive Order Reviews
Under the CAA, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable federal regulations. See 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the CAA. Accordingly, this action merely approves state law as meeting federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:
- Is not a “significant regulatory action” subject to review by the Office of Management and Budget under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);
- does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
- is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.);
- does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);
- does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);
- is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);
- is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);
- is not subject to requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and
- does not provide EPA with the discretionary authority to address, as Start Printed Page 93824appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).
The SIP is not approved to apply on any Indian reservation land or in any other area where EPA or an Indian tribe has demonstrated that a tribe has jurisdiction. In those areas of Indian country, the rules do not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), nor will they impose substantial direct costs on tribal governments or preempt tribal law.
The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing these actions and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. These actions are not a “major rule” as defined by 5 U.S.C. 804(2).
Under section 307(b)(1) of the CAA, petitions for judicial review of these actions must be filed in the United States Court of Appeals for the appropriate circuit by February 21, 2017. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of these actions for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. These actions may not be challenged later in proceedings to enforce its requirements. See section 307(b)(2).
Start List of SubjectsList of Subjects in 40 CFR Part 52
- Environmental protection
- Air pollution control
- Incorporation by reference
- Intergovernmental relations
- Nitrogen dioxide
- Ozone
- Reporting and recordkeeping requirements
Dated: December 6, 2016.
Heather McTeer Toney,
Regional Administrator, Region 4.
40 CFR part 52 is amended as follows:
Start PartPART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS
End Part Start Amendment Part1. The authority citation for part 52 continues to read as follows:
End Amendment PartSubpart Z—Mississippi
Start Amendment Part2. Section 52.1270(e) is amended by adding a new entry “Good Neighbor Provisions (Section 110(a)(2)(D)(i)(I)) for the 2010 1-hour NO 2 NAAQS” at the end of the table to read as follows:
End Amendment PartIdentification of plan.* * * * *(e) * * *
EPA Approved Mississippi Non-Regulatory Provisions
Name of non-regulatory SIP provision Applicable geographic or nonattainment area State submittal date/effective date EPA approval date Explanation * * * * * * * Good Neighbor Provisions (Section 110(a)(2)(D)(i)(I) for the 2010 1-hour NO2 NAAQS Mississippi 5/23/2016 12/22/16, [Insert Federal Register citation] [FR Doc. 2016-30641 Filed 12-21-16; 8:45 am]
BILLING CODE 6560-50-P
Document Information
- Effective Date:
- 1/23/2017
- Published:
- 12/22/2016
- Department:
- Environmental Protection Agency
- Entry Type:
- Rule
- Action:
- Final rule.
- Document Number:
- 2016-30641
- Dates:
- This rule is effective January 23, 2017.
- Pages:
- 93822-93824 (3 pages)
- Docket Numbers:
- EPA-R04-OAR-2016-0421, FRL-9957-09-Region 4
- Topics:
- Air pollution control, Environmental protection, Incorporation by reference, Intergovernmental relations, Nitrogen dioxide, Ozone, Reporting and recordkeeping requirements
- PDF File:
- 2016-30641.pdf
- Supporting Documents:
- » Mississippi 2010 Nitrogen Dioxide 1-hour Infrastructure SIP Prongs 1 & 2, Final, with signed cover letter
- CFR: (1)
- 40 CFR 52.1270