2017-02860. National Performance Management Measures; Assessing Pavement Condition for the National Highway Performance Program and Bridge Condition for the National Highway Performance Program; National Performance Management Measures; Assessing ...  

  • Start Preamble Start Printed Page 10441

    AGENCY:

    Federal Highway Administration (FHWA), Department of Transportation (DOT).

    ACTION:

    Final regulations; delay of effective dates.

    SUMMARY:

    In accordance with the memorandum of January 20, 2017, from the Assistant to the President and Chief of Staff, entitled “Regulatory Freeze Pending Review,” published in the Federal Register on January 24, 2017, the Department delays the effective dates of the following regulations until March 21, 2017: National Performance Management Measures; Assessing Pavement Condition for the National Highway Performance program and Bridge Condition for the National Highway Performance Program, RIN 2125-AF53; and National Performance Management measures; Assessing Performance of the National Highway System, Freight Movement on the Interstate System, and Congestion Mitigation and Air Quality Improvement Program, RIN 2125-AF54.

    DATES:

    Effective February 13, 2017, the effective date of the final rules published on January 18, 2017, at 82 FR 5886 and January 18, 2017, at 82 FR 5970, respectively, is delayed to March 21, 2017.

    The incorporation by reference of certain publications listed in the final rule published on January 18, 2017, at 82 FR 5886 is approved by the Director of the Federal Register as of March 21, 2017.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Christopher Richardson, Assistant Chief Counsel for Legislation, Regulations, and General Law, Office of Chief Counsel, Federal Highway Administration, 1200 New Jersey Avenue SE., Washington, DC 20590. Telephone: (202) 366-0761. Office hours are from 8:00 a.m. to 4:30 p.m. e.t., Monday through Friday, except Federal holidays.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Electronic Access and Filing

    A copy of the Notice of Proposed Rulemakings (NPRMs), all comments received, the Final Rules, and all background material may be viewed online at http://www.regulations.gov using the docket numbers listed above. A copy of this notice will be placed on each docket. Electronic retrieval help and guidelines are available on the Web site. It is available 24 hours each day, 365 days each year. An electronic copy of this document may also be downloaded from the Office of the Federal Register's Web site at http://www.ofr.gov and the Government Publishing Office's Web site at http://www.gpo.gov.

    Background

    On January 20, 2017, the Assistant to the President and Chief of Staff issued a memorandum entitled, “Regulatory Freeze Pending Review.” This memorandum directed heads of executive departments and agencies to take certain steps to ensure that the President's appointees and designees have the opportunity to review new and pending regulations. It instructed agencies to temporarily postpone the effective dates of regulations that had been published in the Federal Register but were not yet effective until 60 days after the date of the memorandum (January 20, 2017). In accordance with that directive, the FHWA is delaying the effective dates of the regulations listed below as follows:

    RINTitleAgency contactOriginal effective dateDelayed effective date
    2125-AF53Assessing Pavement Condition for the National Highway Performance Program and Bridge Condition for the National Highway Performance ProgramFrancine Shaw Whitson, Office of Infrastructure, 202-366-8028February 17, 2017March 21, 2017.
    2125-AF54Assessing Performance of the National Highway System, Freight Movement on the Interstate System, and Congestion Mitigation and Air Quality Improvement ProgramFrancine Shaw Whitson, Office of Infrastructure, 202-366-8028February 17, 2017March 21, 2017.

    Waiver of Rulemaking and Delayed Effective Date

    Under the Administrative Procedure Act (APA) (5 U.S.C. 553), FHWA generally offers interested parties the opportunity to comment on proposed regulations and publishes rules not less than 30 days before their effective dates. However, the APA provides that an agency is not required to conduct notice-and-comment rulemaking or delay effective dates when the agency, for good cause, finds that the requirement is impracticable, unnecessary, or contrary to the public interest (5 U.S.C. 553(b)(B) and (d)(3)). There is good cause to waive both of these requirements here as the President's appointees and designees need to delay the effective dates of these Start Printed Page 10442regulations to have adequate time to review new or pending regulations, and neither the notice and comment process nor delayed effective date could be implemented in time to allow for this review.

    Start List of Subjects

    List of Subjects in 23 CFR Part 490

    • Bridges
    • Highway safety
    • Highways and roads
    • Incorporation by reference
    • Reporting and recordkeeping requirements
    End List of Subjects Start Signature

    Issued on: February 7, 2017.

    Walter C. Waidelich, Jr.,

    Acting Deputy Administrator, Federal Highway Administration.

    End Signature End Supplemental Information

    [FR Doc. 2017-02860 Filed 2-10-17; 8:45 am]

    BILLING CODE 4910-22-P

Document Information

Effective Date:
3/21/2017
Published:
02/13/2017
Department:
Federal Highway Administration
Entry Type:
Rule
Action:
Final regulations; delay of effective dates.
Document Number:
2017-02860
Dates:
Effective February 13, 2017, the effective date of the final rules published on January 18, 2017, at 82 FR 5886 and January 18, 2017, at 82 FR 5970, respectively, is delayed to March 21, 2017.
Pages:
10441-10442 (2 pages)
Docket Numbers:
Docket No. FHWA-2013-0053, FHWA-2013-0054
RINs:
2125-AF53: National Goals and Performance Management Measures 2 (MAP-21), 2125-AF54: National Goals and Performance Management Measures 3 (MAP-21)
RIN Links:
https://www.federalregister.gov/regulations/2125-AF53/national-goals-and-performance-management-measures-2-map-21-, https://www.federalregister.gov/regulations/2125-AF54/national-goals-and-performance-management-measures-3-map-21-
Topics:
Bridges, Highway safety, Highways and roads, Incorporation by reference, Reporting and recordkeeping requirements
PDF File:
2017-02860.pdf
Supporting Documents:
» WSDOT Pavement Asset Management 2816
» Recording and Coding Guide for NBI - Incl Errata Sheet 062011 (jn)
» PM3 - Final Rule FHWA-2017-00681 FR Vol 82 No 11 January 18, 2017
» PM2 Final Rule 12866 copy showing OMB changes 1.10.16 (redline)
» PM2 - NPRM FHWA-2013-0053 FR Vol 80 No 2 January 5 2015
» PM1 - Final Rule FHWA-2013-0020-11417 FR Vol 81 No 50 March 15 2016
» Planning - Final Rule FHWA-2013-0037-0178 FR Vol 81 No 103 May 27 2016
» Performance Measures for Pavement Assets under Performance Based Contracts
» Pavement Fact Sheet Kansas DOT
» Pavement Management Practices
CFR: (1)
23 CFR 490