2017-10854. Drawbridge Operation Regulation; Cerritos Channel, Long Beach, CA  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of deviation from drawbridge regulation.

    SUMMARY:

    The Coast Guard has issued a temporary deviation from the operating schedule that governs the Henry Ford Avenue railroad bridge across Cerritos Channel, mile 4.8 at Long Beach, CA. The deviation is necessary to allow the bridge owner to replace the operating machinery of the bridge. This deviation allows the bridge to remain in the closed-to-navigation position during the deviation period.

    DATES:

    This deviation is effective from 6:30 p.m. on May 27, 2017 to 6:30 p.m. on June 10, 2017.

    ADDRESSES:

    The docket for this deviation, [USCG-2017-0462], is available at http://www.regulations.gov. Type the docket number in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this deviation.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this temporary deviation, call or email Carl T. Hausner, Chief, Bridge Section, Eleventh Coast Guard District; telephone 510-437-3516; email Carl.T.Hausner@uscg.mil.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Port of Los Angeles has requested a temporary change to the operation of the Henry Ford Avenue railroad bridge, mile 4.8, over Cerritos Channel, at Long Beach, CA. The drawbridge navigation span provides a vertical clearance of 6 feet above Mean High Water in the closed-to-navigation position. The draw operates as required by 33 CFR 117.147(b). Navigation on the waterway is commercial, search and rescue, law enforcement, and recreational.

    The drawspan will be secured in the closed-to-navigation position from 6:30 p.m. on May 27, 2017 to 6:30 p.m. on June 10, 2017, to allow the bridge owner to replace the operating machinery. This temporary deviation has been coordinated with the waterway users. No objections to the proposed temporary deviation were raised.

    Vessels able to pass through the bridge in the closed position may do so at any time. The bridge will be able to open for emergencies with between 4 to 24 hours advance notice. Los Angeles Harbor can be used as an alternate route for vessels. The Coast Guard will also inform the users of the waterway through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so vessel operators can arrange their transits to minimize any impact caused by the temporary deviation.

    In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: May 22, 2017.

    C.T. Hausner,

    District Bridge Chief, Eleventh Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 2017-10854 Filed 5-25-17; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Effective Date:
5/27/2017
Published:
05/26/2017
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of deviation from drawbridge regulation.
Document Number:
2017-10854
Dates:
This deviation is effective from 6:30 p.m. on May 27, 2017 to 6:30 p.m. on June 10, 2017.
Pages:
24249-24249 (1 pages)
Docket Numbers:
Docket No. USCG-2017-0462
PDF File:
2017-10854.pdf
CFR: (1)
33 CFR 117