2017-18546. Drawbridge Operation Regulation; Willamette River, Portland, OR  

  • Start Preamble Start Printed Page 41520

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of deviation from drawbridge regulation.

    SUMMARY:

    The Coast Guard has issued a temporary deviation from the operating schedule that governs the Morrison Bridge across the Willamette River, mile 12.8, at Portland, Oregon. The deviation is necessary to accommodate Multnomah County's (bridge owner) replacement of the bridge decking. This deviation allows the bridge to only open half of the span, single leaf, to allow for the replacement of bridge decking. The deviation also allows the vertical clearance to be reduced due to the project's containment system.

    DATES:

    This deviation is effective from 6 a.m. on September 5, 2017 through 7 p.m. on October 31, 2017.

    ADDRESSES:

    The docket for this deviation, USCG-2017-0826 is available at http://www.regulations.gov. Type the docket number in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this deviation.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this temporary deviation, call or email Mr. Steven Fischer, Bridge Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, email d13-pf-d13bridges@uscg.mil.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Multnomah County has requested that the Morrison Bridge across the Willamette River, mile 12.8, be allowed to only open half the span, 92 feet, as opposed to a full opening, 185 feet, to accommodate the replacement of the bridge decking. The county has also requested to reduce the vertical clearance of the non-functioning leaf with scaffolding erected 10 feet below the lower bridge cord for a containment system, and require at least a two hour advance notice for an opening. The Morrison Bridge is a double bascule bridge. When the bascule span is in the closed-to-navigation position, the bridge provides 69 feet of vertical clearance, which will be reduced to 59 feet with the containment system in place. The normal operating schedule for the Morrison Bridge is in accordance with 33 CFR 117.897(c)(3)(iv). The vertical clearance is above Columbia River Datum 0.0.

    The deviation period is from 6 a.m. on September 5, 2017 through 7 p.m. on October 31, 2017. The deviation allows the Morrison Bridge operator to only open half the span for maritime traffic with at least a two hour advanced notice. Waterway usage on this part of the Willamette River includes vessels ranging from commercial tug and barge to small pleasure craft.

    Vessels able to pass through the Morrison Bridge in the closed-to-navigation position may do so at any time. A tug will be provided, upon request, to assist vessels through the single leaf span opening. The bridge will be able to open half the span for emergencies with a two hour notice and there is no immediate alternate route for vessels to pass. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridges so that vessel operators can arrange their transits to minimize any impact caused by the temporary deviation.

    In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: August 25, 2017.

    Steven M. Fischer,

    Bridge Administrator, Thirteenth Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 2017-18546 Filed 8-31-17; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Effective Date:
9/5/2017
Published:
09/01/2017
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of deviation from drawbridge regulation.
Document Number:
2017-18546
Dates:
This deviation is effective from 6 a.m. on September 5, 2017 through 7 p.m. on October 31, 2017.
Pages:
41520-41520 (1 pages)
Docket Numbers:
Docket No. USCG-2017-0826
PDF File:
2017-18546.pdf
CFR: (1)
33 CFR 117