-
Start Preamble
AGENCY:
Coast Guard, DHS.
ACTION:
Temporary final rule.
SUMMARY:
The Coast Guard is establishing temporary safety zones in the Mifflin Range on the Delaware River to facilitate pipeline removal in preparation for the deepening of the Delaware River. The safety zones will be established for the waters in the vicinity of the dredge, dredge equipment, dive operations, and pipe removal operations. This regulation is necessary to provide for the safety of life on navigable waters of the Delaware River in the vicinity of pipeline removal operations and to protect mariners from the hazards associated with dredging and pipeline removal operations. Entry of vessels or persons into these zones is prohibited unless specifically authorized by the Captain of the Port Delaware Bay.
DATES:
This rule is effective from November 6, 2017, through December 4, 2017.
ADDRESSES:
To view documents mentioned in this preamble as being available in the docket, go to http://www.regulations.gov,, type USCG-2017-1011 in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this rule.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
If you have questions on this rule, call or email Petty Officer Edmund Ofalt, Waterways Management Branch, U.S. Coast Guard Sector Delaware Bay; telephone (215) 271-4814, email Edmund.J.Ofalt@uscg.mil.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
I. Table of Abbreviations
CFR Code of Federal Regulations
COTP Captain of the Port
DHS Department of Homeland Security
FR Federal Register
NPRM Notice of proposed rulemaking
§ Section
U.S.C. United States Code
II. Background Information and Regulatory History
The Coast Guard is issuing this temporary rule without prior notice and opportunity to comment pursuant to authority under section 4(a) of the Administrative Procedure Act (APA) (5 U.S.C. 553(b)). This provision authorizes an agency to issue a rule without prior notice and opportunity to comment when the agency for good cause finds that those procedures are “impracticable, unnecessary, or contrary to the public interest.” Under 5 U.S.C. 553(b)(B), the Coast Guard finds that good cause exists for not publishing a notice of proposed rulemaking (NPRM) with respect to this rule due to the short time period between when Sector Delaware Bay received complete details of this project, October 20, 2017, and the date when these safety zones needed to go into effect by. It is impracticable and contrary to the public interest to publish an NPRM to provide a notice and opportunity for comment period because the safety zones must be established by November 6, 2017 to ensure safety of life on navigable waters in the vicinity of dredging operations, underwater cutting operations, and pipeline removal operations and to protect mariners from hazards associated with the same.
Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good cause exists for making this rule effective less than 30 days after publication in the Federal Register. Delaying the effective date of this rule would be impracticable and contrary to the public interest because immediate action is needed to mitigate the hazards presented to safety of life on the Delaware River by the presence of dredge equipment, dredging operations, dive operations, and pipeline removal operations. Start Printed Page 51348
III. Legal Authority and Need for Rule
The Coast Guard is issuing this rule under authority in 33 U.S.C. 1231. The Captain of the Port (COTP) Delaware Bay has determined that potential hazards associated with dredging, dive operations, and pipeline removal operations starting November 6, 2017, will be a safety concern for vessels attempting to transit the Delaware River along the Mifflin Range. This rule is needed to protect personnel, vessels, and the marine environment on the navigable waters within the safety zone while dredging, dive operations, and pipeline removal operations are being conducted.
IV. Discussion of the Rule
This rule establishes two safety zones on a portion of the Mifflin Range, just upriver of the green 63 buoy, in the Delaware River from November 6, 2017, through December 4, 2017, unless cancelled earlier by the COTP, to facilitate dredging, dive operations, and pipeline removal. Dredging operations to expose the pipeline will commence on November 6, 2017. The hopper dredge 549 will be conducting the dredging operations and will be attended by the towing vessel SHELBY. Dive operations will commence approximately one week after the completion of dredging operations and will continue through completion of removal of the pipeline.
Safety zone one includes all navigable waters within 250 yards of the dredge barge 549 and associated pipeline removal equipment, to include any equipment located within Anchorage 9 near the entrance to Mantua Creek found in 33 CFR 110.157(a)(10).
Safety zone two includes all navigable waters within 250 yards of the dive barge 543 and all associated pipeline removal equipment, to include any equipment located within Anchorage 9 near the entrance to Mantua Creek Found in 33 CFR 110.157 (a)(10).
Vessels requesting to transit either safety zone must contact the towing vessel SHELBY on VHF-FM channel 13 or 65, at least 1 hour, as well as 30 minutes prior to arrival to arrange safe passage. Vessels may also contact the COTP for permission to enter or transit either safety zone on VHF-FM channel 16.
V. Regulatory Analyses
We developed this rule after considering numerous statutes and Executive orders related to rulemaking. Below we summarize our analyses based on a number of these statutes and Executive orders, and we discuss First Amendment rights of protestors.
A. Regulatory Planning and Review
Executive Orders 12866 and 13563 direct agencies to assess the costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits. Executive Order 13771 directs agencies to control regulatory costs through a budgeting process. This rule has not been designated a “significant regulatory action,” under Executive Order 12866. Accordingly, this rule has not been reviewed by the Office of Management and Budget (OMB), and pursuant to OMB guidance it is exempt from the requirements of Executive Order 13771.
This regulatory action determination is based on the size, location, and duration of the safety zones. Although this regulation will restrict access to regulated areas, the effect of this rule will not be significant because there are a number of alternate anchorages available. Furthermore, vessels may be permitted to transit through the safety zone with the permission of the COTP or make satisfactory passing arrangements with the towing vessel SHELBY in accordance with this rule and the Rules of the Road (33 CFR subchapter E). Extensive notification of the safety zones to the maritime public will be made via maritime advisories allowing mariners to alter their plans accordingly.
B. Impact on Small Entities
The Regulatory Flexibility Act of 1980, 5 U.S.C. 601-612, as amended, requires Federal agencies to consider the potential impact of regulations on small entities during rulemaking. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000. The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities.
While some owners or operators of vessels intending to transit the safety zone may be small entities, for the reasons stated in section V.A above, this rule will not have a significant economic impact on any vessel owner or operator.
Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we want to assist small entities in understanding this rule. If the rule would affect your small business, organization, or governmental jurisdiction and you have questions concerning its provisions or options for compliance, please contact the person listed in the FOR FURTHER INFORMATION CONTACT section.
Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR (1-888-734-3247). The Coast Guard will not retaliate against small entities that question or complain about this rule or any policy or action of the Coast Guard.
C. Collection of Information
This rule will not call for a new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).
D. Federalism and Indian Tribal Governments
A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. We have analyzed this rule under that Order and have determined that it is consistent with the fundamental federalism principles and preemption requirements described in Executive Order 13132.
Also, this rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes. If you believe this rule has implications for federalism or Indian tribes, please contact the person listed in the FOR FURTHER INFORMATION CONTACT section above.
E. Unfunded Mandates Reform Act
The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a Start Printed Page 51349State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 (adjusted for inflation) or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.
F. Environment
We have analyzed this rule under Department of Homeland Security Management Directive 023-01 and Commandant Instruction M16475.lD, which guide the Coast Guard in complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321-4370f), and have determined that this action is a category of actions that do not individually or cumulatively have a significant effect on the human environment. This rule involves a safety zone that encompasses all navigable waters within 250 yards of a dredge, diving operations, pipeline removal operations and all associated equipment. It is categorically excluded from further review under paragraph 34(g) of Figure 2-1 of the Commandant Instruction. A Record of Environmental Consideration supporting this determination is available in the docket where indicated under ADDRESSES.
G. Protest Activities
The Coast Guard respects the First Amendment rights of protesters. Protesters are asked to contact the person listed in the FOR FURTHER INFORMATION CONTACT section to coordinate protest activities so that your message can be received without jeopardizing the safety or security of people, places or vessels.
Start List of SubjectsList of Subjects in 33 CFR Part 165
- Harbors
- Marine Safety
- Navigation (water)
- Reporting and recordkeeping requirements
- Security measures
- Waterways
For the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 165 as follows:
Start PartPART 165—REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS
End Part Start Amendment Part1. The authority citation for part 165 continues to read as follows:
End Amendment Part Start Amendment Part2. Add § 165.T05-1011, to read as follows:
End Amendment PartSafety Zone, Delaware River; Pipeline Removal.(a) Location. The following areas are safety zones:
(1) Safety zone one includes all navigable waters within 250 yards of the dredge barge 549 and associated equipment operating in Mifflin Range and Anchorage 9 near the entrance to Mantua Creek, upriver of green buoy 63, on the Delaware River.
(2) Safety zone two includes all navigable waters within 250 yards of the dive barge 543 and associated equipment operating in Mifflin range and Anchorage 9 near the entrance to Mantua Creek, upriver of green buoy 63, on the Delaware River.
(b) Definitions. (1) Captain of the Port means the Commander Sector Delaware Bay or any Coast Guard commissioned, warrant, or petty officer who has been authorized by the Captain of the Port to act on his behalf.
(2) Designated representative means any Coast Guard commissioned, warrant or petty officer who has been authorized by the Captain of the Port, Delaware Bay, to assist with the enforcement of safety zones described in paragraph (a) of this section.
(c) Regulations. The general safety zone regulations found in 33 CFR part 165 subpart C apply to the safety zone created by this section.
(1) Entry into or transiting within either safety zone is prohibited unless vessels obtain permission from the Captain of the Port via VHF-FM channel 16, or make satisfactory passing arrangements via VHF-FM channels 13 or 65, with the towing vessel SHELBY per this section and the rules of the Road (33 CFR subchapter E). Vessels requesting to transit shall contact the towing vessel SHELBY on channel 13 or 65, at least 1 hour, as well as 30 minutes, prior to arrival.
(2) Vessels granted permission to enter and transit the safety zone must do so in accordance with any directions or orders of the Captain of the Port, his designated representative, or the towing vessel SHELBY. No person or vessel may enter or remain in a safety zone without permission from the Captain of the Port or the towing vessel SHELBY.
(3) At least one side of the main navigational channel will be kept clear for safe passage of vessels.
(4) This section applies to all vessels that intend to transit through the safety zone except vessels that are engaged in the following operations: Enforcement of laws; service of aids to navigation, and emergency response.
(d) Enforcement periods. This section will be enforced from November 6, 2017, through December, 4 2017.
Dated: November 1, 2017.
Scott E. Anderson,
Captain, U.S. Coast Guard, Captain of the Port, Delaware Bay.
[FR Doc. 2017-24068 Filed 11-3-17; 8:45 am]
BILLING CODE 9110-04-P
Document Information
- Effective Date:
- 11/6/2017
- Published:
- 11/06/2017
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Temporary final rule.
- Document Number:
- 2017-24068
- Dates:
- This rule is effective from November 6, 2017, through December 4, 2017.
- Pages:
- 51347-51349 (3 pages)
- Docket Numbers:
- Docket Number USCG-2017-1011
- RINs:
- 1625-AA00: Safety Zone Regulations
- RIN Links:
- https://www.federalregister.gov/regulations/1625-AA00/safety-zone-regulations
- Topics:
- Harbors, Marine safety, Navigation (water), Reporting and recordkeeping requirements, Security measures, Waterways
- PDF File:
- 2017-24068.pdf
- Supporting Documents:
- » Coast Guard National Environment Policy Act (NEPA) Record of Environmental Consideration (REC) for Categorically Excluded Actions
- CFR: (1)
- 33 CFR 165.T05-1011