2018-15126. Jordan Cove Energy Project, L.P.; Pacific Connector Gas Pipeline, L.P.; Notice of Meeting
-
Start Preamble
The environmental staff of the Federal Energy Regulatory Commission (Commission) along with representatives of the U.S. Forest Service, Bureau of Land Management, and the U.S. Army Corps of Engineers will meet with representatives of the Confederated Tribes of the Coos, Lower Umpqua and Siuslaw Indians to discuss the proposed Jordan Cove LNG and Pacific Connector Pipeline Projects. The meeting will be held at the location and time listed below:
North Bend Public Library—Big Meeting Room, 1800 Sherman Avenue, North Bend, OR 97459, Phone: (541) 756-0400, Tuesday, July 17, 2018, 1:00 p.m. PDT
Members of the public and intervenors in the referenced proceeding may attend and observe this meeting; however, participation will be limited to tribal representatives and agency personnel. If tribal representatives decide to disclose information about a specific location which could create a risk or harm to an archeological site or Native American cultural resource, the public will be excused for that portion of the meeting. A summary of the meeting will be entered into the Commission's administrative record.
If you plan to attend this meeting, please contact Mr. John Peconom, Environmental Project Manager at (202) 502-6352 or John.Peconom@ferc.gov.
Start SignatureDated: July 10, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-15126 Filed 7-13-18; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 07/16/2018
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2018-15126
- Pages:
- 32852-32852 (1 pages)
- Docket Numbers:
- Docket Nos. CP17-495-000, CP17-494-000
- PDF File:
- 2018-15126.pdf