2018-28052. Commission Information Collection Activities (FERC-715); Comment Request; Extension  

  • Start Preamble

    AGENCY:

    Federal Energy Regulatory Commission.

    ACTION:

    Notice of information collection and request for comments.

    SUMMARY:

    In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-715 (Annual Transmission Planning and Evaluation Report).

    DATES:

    Comments on the collection of information are due February 25, 2019.

    ADDRESSES:

    You may submit comments (identified by Docket No. IC19-13-000) by either of the following methods:

    Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: http://www.ferc.gov/​help/​submission-guide.asp. For user assistance, contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 (toll-free), or (202) 502-8659 for TTY.

    Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at http://www.ferc.gov/​docs-filing/​docs-filing.asp.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 273-0873.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Title: FERC-715, Annual Transmission Planning and Evaluation Report.

    OMB Control No.: 1902-0171.

    Abstract: Acting under FPA section 213,[1] FERC requires each transmitting utility that operates integrated transmission system facilities rated above 100 kilovolts (kV) to submit annually:

    • Contact information for the FERC-715;
    • Base case power flow data (if it does not participate in the development and use of regional power flow data);
    • Transmission system maps and diagrams used by the respondent for transmission planning;
    • A detailed description of the transmission planning reliability criteria used to evaluate system performance for time frames and planning horizons used in regional and corporate planning;
    • A detailed description of the respondent's transmission planning assessment practices (including, but not limited to, how reliability criteria are applied and the steps taken in performing transmission planning studies); and
    • A detailed evaluation of the respondent's anticipated system performance as measured against its stated reliability criteria using its stated assessment practices.

    The FERC-715 enables the Commission to use the information as part of their regulatory oversight functions which includes:

    • The review of rates and charges;
    • The disposition of jurisdictional facilities;
    • The consolidation and mergers;
    • The adequacy of supply and;
    • Reliability of the nation's transmission grid.

    The FERC-715 enables the Commission to facilitate and resolve transmission disputes. Additionally, the Office of Electric Reliability (OER) uses the FERC-715 data to help protect and improve the reliability and security of the nation's bulk power system. OER oversees the development and review of mandatory reliability and security standards and ensures compliance with Start Printed Page 66698the approved standards by the users, owners, and operators of the bulk power system. OER also monitors and addresses issues concerning the nation's bulk power system including assessments of resource adequacy and reliability.

    Without the FERC-715 data, the Commission would be unable to evaluate planned projects or requests related to transmission.

    Type of Respondent: Integrated transmission system facilities rated at or above 100 kilovolts (kV).

    Estimate of Annual Burden:[2] The Commission estimates the total annual burden and cost [3] for this information collection as follows.

    FERC-715, Annual Transmission Planning and Evaluation Report

    Number of respondentsAnnual number of responses per respondentTotal number of responsesAverage burden & cost per responseTotal annual burden hours & total annual costCost per respondent $
    (1)(2)(1) * (2) = (3)(4)(3) * (4) = (5)(5) ÷ (1)
    Annual Transmission Planning and Evaluation Report 41111111160 hrs.; $11,897.6017,760 hrs.; $1,320,633.60$11,897.60

    Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.

    Start Signature

    Dated: December 19, 2018.

    Kimberly D. Bose,

    Secretary.

    End Signature End Supplemental Information

    Footnotes

    2.  “Burden” is the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, refer to Title 5 Code of Federal Regulations 1320.3.

    Back to Citation

    3.  The hourly cost (for salary plus benefits) uses the figures from the Bureau of Labor Statistics, May 2017, for the listed reporting requirements. These figures include salary (https://www.bls.gov/​oes/​current/​naics2_​22.htm) and benefits (http://www.bls.gov/​news.release/​ecec.nr0.htm) and are:

    —Management (Code 11-0000), $94.28/hr.

    —Computer and mathematical (Code 15-0000), $63.25/hr.

    —Electrical Engineers (Code 17-2071), $66.90/hr.

    —Economist (Code 19-3011), $71.98/hr.

    —Computer and Information Systems Managers (Code 11-3021), $96.51/hr.

    —Accountants and Auditors (Code 13-2011), $56.59/hr.

    —Transportation, Storage, and Distribution Managers (Code 11-3071), $88.61/hr.

    —Power Distributors and Dispatchers (Code 51-8012), $56.74/hr.

    —We are using the average hourly cost (for wages plus benefits, for these categories) of $74.36/hour.

    Back to Citation

    4.  In 2018, FERC had 111 direct filings (responses) from entities. However there were 239 total respondents if Transmitting Utilities that have their filing submitted by a designated reporting agent, such as a regional entity, are counted independently.

    Back to Citation

    [FR Doc. 2018-28052 Filed 12-26-18; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
12/27/2018
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Action:
Notice of information collection and request for comments.
Document Number:
2018-28052
Dates:
Comments on the collection of information are due February 25, 2019.
Pages:
66697-66698 (2 pages)
Docket Numbers:
Docket No. IC19-13-000
PDF File:
2018-28052.pdf