2019-03436. PUD No. 1 of Chelan County; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests  

  • Start Preamble

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

    a. Application Type: Non-Project Use of Project Lands and Waters.

    b. Project No: 2145-127.

    c. Date Filed: February 7, 2019.

    d. Applicant: PUD No. 1 of Chelan County.

    e. Name of Project: Rocky Reach Hydroelectric Project.

    f. Location: The project is located on the Columbia River in Douglas and Chelan counties, Washington.

    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.

    h. Applicant Contact: Jeff Osborn, Compliance Program Manager, PUD No. 1 of Chelan County; P.O. Box 1231 Wenatchee, WA 98807-1231; Jeff.Osborn@chelanpud.org, (888) 663-8121.

    i. FERC Contact: Krista Sakallaris, (202) 502-6302, Krista.Sakallaris@ferc.gov.

    j. Deadline for filing comments, motions to intervene, and protests: March 25, 2019.

    The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission's eFiling system at http://www.ferc.gov/​docs-filing/​efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/​docs-filing/​ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P-2145-127. Comments emailed to Commission staff are not considered part of the Commission record.

    The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

    k. Description of Request: PUD No. 1 of Chelan County proposes to permit the City of Entiat to construct a 13,234-square-foot-marina with 65 slips, two gangways, a headwalk dock, day use dock and fingers, overnight moorage docks, a fuel dock, and a sanitary pump station, within the Rocky Reach Hydroelectric Project's boundary. The proposed marina and related facilities would provide recreational lake access and boat moorage, for 69 watercraft, on the Columbia River in the City of Entiat, Chelan County, Washington.

    l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502-8371. This filing may also be viewed on the Commission's website at http://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item (h) above. Agencies may obtain copies of the application directly from the applicant.

    m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    n. Comments, Protests, or Motions to Intervene: Anyone may submit Start Printed Page 6780comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010.

    Start Signature

    Dated: February 21, 2019.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2019-03436 Filed 2-27-19; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
02/28/2019
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2019-03436
Pages:
6779-6780 (2 pages)
Docket Numbers:
Project No. 2145-127
PDF File:
2019-03436.pdf