2021-19358. Pacific Gas and Electric Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
-
Start Preamble
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:
a. Application Type: Application for Temporary Variance of Flow Requirements.
b. Project No: 1121-132.
c. Date Filed: August 25, 2021.
d. Applicant: Pacific Gas and Electric Company (licensee).
e. Name of Project: Battle Creek Hydroelectric Project.
f. Location: The project is located on Battle Creek and its tributaries in Shasta and Tehama counties, California.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Ms. Megan Young, License Coordinator, Pacific Gas and Electric Company, Mail Code: N11D, P.O. Box 770000, San Francisco, CA 94177, Phone: (530) 364-6009.
i. FERC Contact: John Aedo, (415) 369-3335, john.aedo@ferc.gov.
j. Deadline for filing comments, motions to intervene, and protests: September 21, 2021.
The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Start Printed Page 50342Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include the docket number P-1121-132. Comments emailed to Commission staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
k. Description of Request: The licensee requests a temporary variance of the minimum flow requirements at three project locations, including North Fork Battle Creek below North Battle Creek Dam, North Fork Battle Creek below Macumber Reservoir, and Battle Creek below Coleman Powerhouse. Specifically, the licensee requests Commission approval to reduce flows below North Battle Creek Reservoir and Macumber Reservoir from a 0.3 cubic feet per second (cfs) instantaneous requirement to a 24-hour average flow. Similarly, the licensee proposes to reduce flows in Battle Creek from a 150 cfs instantaneous minimum flow to a 24-hour average flow. The licensee states that the flow modification would conserve limited water resources during the current drought conditions and to maintain reservoir elevation and water quality in project reservoirs. The licensee requests the variance through October 31, 2021.
l. Locations of the Application: This filing may be viewed on the Commission's website at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. Agencies may obtain copies of the application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE” as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010.
Start SignatureDated: September 1, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-19358 Filed 9-7-21; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 09/08/2021
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2021-19358
- Pages:
- 50341-50342 (2 pages)
- Docket Numbers:
- Project No. 1121-132
- PDF File:
- 2021-19358.pdf