Public Comments 2006-D024-D. Aberle

Document ID: DARS-2006-0086-0003
Document Type: Public Submission
Agency: Defense Acquisition Regulations System
Received Date: December 12 2006, at 03:46 PM Eastern Standard Time
Date Posted: December 15 2006, at 12:00 AM Eastern Standard Time
Comment Start Date: November 9 2006, at 12:00 AM Eastern Standard Time
Comment Due Date: January 8 2007, at 11:59 PM Eastern Standard Time
Tracking Number: 801eca0d
View Document:  View as format xml

View Comment

We strongly object to this proposed change in operation. This proposed rule will increase the administrative costs of completing services and delivering parts. It will produce a significant increase in paperwork creation, administration and coordination. Printing every DD250 for each individual part delivery will delay shipment of product. In addition, it may increase of the cost of the product (overhead) through the requirement of additional headcount in shipping. Existing contract pricing does not adequately cover the additional administrative costs. Based on the fact that the printing from WAWF-RA would be a manual process, we recommend that at a minimum alternative language be added that allows for the use of contractor format DD250 material and inspection receiving reports instead of actual WAWF-RA report printing. Delina Aberle Procedure and Process Manager Military Engines Contracts Management Phone: 860-565-5714 Fax: 860-755-1419

Related Comments

   
Total: 3
Public Comments 2006-D024-T. Hlavac
Public Submission    Posted: 12/15/2006     ID: DARS-2006-0086-0002

Jan 08,2007 11:59 PM ET
Public Comments 2006-D024-D. Aberle
Public Submission    Posted: 12/15/2006     ID: DARS-2006-0086-0003

Jan 08,2007 11:59 PM ET
Public Comments 2006-D024-T.Hodgkins
Public Submission    Posted: 01/08/2007     ID: DARS-2006-0086-0004

Jan 08,2007 11:59 PM ET