Home »
Rulemaking » Comment (1) of Christopher E. Earls on Behalf of the Nuclear Energy Institute on Draft Regulatory Issue Summary "NRC Position on the Relationship Between General Design Criteria and Technical Specification Operability"
Comment (1) of Christopher E. Earls on Behalf of the Nuclear Energy Institute on Draft Regulatory Issue Summary "NRC Position on the Relationship Between General Design Criteria and Technical Specification Operability"
Document ID: NRC-2012-0179-0002
Document Type: Public Submission
Agency: Nuclear Regulatory Commission
Received Date: November 27 2012, at 12:00 AM Eastern Standard Time
Date Posted: November 27 2012, at 12:00 AM Eastern Standard Time
Comment Start Date: July 31 2012, at 12:00 AM Eastern Standard Time
Comment Due Date: September 14 2012, at 11:59 PM Eastern Standard Time
Comment (1) of Christopher E. Earls on Behalf of the Nuclear Energy Institute on Draft Regulatory Issue Summary "NRC Position on the Relationship Between General Design Criteria and Technical Specification Operability"
This is comment on Proposed Rule
NRC Position on the Relationship Between General Design Criteria and Technical Specification Operability: Public Meeting
View Comment
Attachments:
1earls
Title:
1earls
Related Comments
Public Submission Posted: 11/27/2012 ID: NRC-2012-0179-0002
Sep 14,2012 11:59 PM ET
Public Submission Posted: 11/27/2012 ID: NRC-2012-0179-0003
Sep 14,2012 11:59 PM ET