Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 23 - Highways |
Chapter I - Federal Highway Administration, Department of Transportation |
SubChapter G - Engineering and Traffic Operations |
Part 636 - Design-Build Contracting |
Subpart B - Selection Procedures, Award Criteria |
§ 636.201 - What selection procedures and award criteria may be used? |
§ 636.202 - When are two-phase design-build selection procedures appropriate? |
§ 636.203 - What are the elements of two-phase selection procedures for competitive proposals? |
§ 636.204 - What items may be included in a phase-one solicitation? |
§ 636.205 - Can past performance be used as an evaluation criteria? |
§ 636.206 - How do I evaluate offerors who do not have a record of relevant past performance? |
§ 636.207 - Is there a limit on short listed firms? |
§ 636.208 - May I use my existing prequalification procedures with design-build contracts? |
§ 636.209 - What items must be included in a phase-two solicitation? |
§ 636.210 - What requirements apply to projects which use the modified design-build procedure? |
§ 636.211 - When and how should tradeoffs be used? |
§ 636.212 - To what extent must tradeoff decisions be documented? |