§ 60.5805 - What is the process for the issuance of ERCs?  


Latest version.
  • § 60.5805 What is the process for the issuance of ERCs?

    If your plan uses ERCs your plan must include the process and requirements for issuance of ERCs to affected EGUs and eligible resources set forth in paragraphs (a) through (f) of this section.

    (a) Eligibility application. Your plan must require that, to receive ERCs, the owner or operator must submit an eligibility application to you that demonstrates that the requirements of your State plan as approved by the EPA as meeting § 60.5795 (for an affected EGU) or § 60.5800 (for an eligible resource) are met, and, in the case of an eligible resource, includes at a minimum:

    (1) Documentation that the eligibility application has only been submitted to you, or pursuant to an EPA-approved multi-State collaborative approach;

    (2) An EM&V plan that meets the requirements of the State plan as approved by the EPA as meeting § 60.5830; and

    (3) A verification report from an independent verifier that verifies the eligibility of the eligible resource to be issued an ERC and that the EM&V plan meets the requirements of the State plan as approved by the EPA of meeting § 60.5805.

    (b) Registration. Your plan must require that any affected EGU or eligible resource register with an ERC tracking system that meets the requirements of § 60.5810 prior to the issuance of ERCs, and your plan must specify that you will only register an affected EGU or eligible resource after you approve its eligibility application and determine that the requirements of paragraph (a) of this section are met.

    (c) M&V reports. For an eligible resource registered pursuant to paragraph (b) of this section, your plan must require that, prior to issuance of ERCs by you, the owner or operator must submit the following:

    (1) An M&V report that meets the requirements of your State plan as approved by the EPA as meeting § 60.5835; and

    (2) A verification report from an independent verifier that verifies that the requirements for the M&V report are met.

    (d) [Reserved]

    (e) Issuance of ERCs. Your plan must specify your procedure for issuance of ERCs based on your review of an M&V report and verification report, and must require that ERCs be issued only on the basis of energy actually generated or saved, and that only one ERC is issued for each verified MWh.

    (f) Tracking system. Your plan must require that ERCs may only be issued through an ERC tracking system approved as part of the State plan.

    (g) Error adjustment. Your plan must include a mechanism to adjust the number of ERCs issued if any are issued based on error (clerical, formula input error, etc.).

    (h) Qualification status of an eligible resource. Your plan must include a mechanism to temporarily or permanently revoke the qualification status of an eligible resource, such that it can no longer be issued ERCs for at least the duration that it does not meet the requirements for being issued ERCs in your State plan.

    (i) Qualification status of an independent verifier -

    (1) Eligibility. To be an independent verifier, a person must be approved by the State as:

    (A) An independent verifier, as defined by this regulation; and

    (B) Eligible to verify eligibility applications, EM&V plans, and/or M&V reports per the requirements of the approved State plan as meeting §§ 60.5830 and 60.5835 respectively.

    (2) Revocation of qualification. Your plan must include a mechanism to temporarily or permanently revoke the qualification status of an independent verifier, such that it can no longer verify eligibility applications, EM&V plans or M&V reports for at least the duration of the period it does not meet the requirements of your State plan.