Subpart RRRa - Standards of Performance for Volatile Organic Compound Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor Processes for Which Construction, Reconstruction, or Modification Commenced After April 25, 2023  


§ 60.700a - Am I subject to this subpart?
§ 60.710a - What are my requirements for closed vent systems?
Table 1 to Subpart RRRa of Part 60 - —Emission Limits and Standards for Vent Streams
Table 2 to Subpart RRRa of Part 60 - —Monitoring Requirements for Complying With 98 Weight-Percent Reduction of Total Organic Compounds Emissions or a Limit of 20 Parts Per Million by Volume
Table 3 to Subpart RRRa of Part 60 - —Operating Parameters, Operating Parameter Limits and Data Monitoring, Recordkeeping and Compliance Frequencies
Table 4 to Subpart RRRa of Part 60 - —Calibration and Quality Control Requirements for Continuous Parameter Monitoring System (CPMS)
§ 60.701a - What definitions must I know?
§ 60.702a - What standards and associated requirements must I meet?
§ 60.703a - What are my monitoring, installation, operation, and maintenance requirements?
§ 60.704a - What test methods and procedures must I use to determine compliance with the standards?
§ 60.705a - What records must I keep and what reports must I submit?
§ 60.706a - What do the terms associated with reconstruction mean for this subpart?
§ 60.707a - What are the chemicals that I must produce to be affected by subpart RRRa?
§ 60.708a - [Reserved]
§ 60.709a - What are my requirements if I use a flare to comply with this subpart?