Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 46 - Shipping |
Chapter I - Coast Guard, Department of Homeland Security |
SubChapter Q - Equipment, Construction, and Materials: Specifications and Approval |
Part 160 - Lifesaving Equipment |
Subpart 160.156 - Rescue Boats and Fast Rescue Boats (SOLAS) |
§ 160.156-23 - Procedure for approval of design, material, or construction change.
-
§ 160.156-23 Procedure for approval of design, material, or construction change.
(a) Each change in design, material, or construction from the plans approved under 46 CFR 159.005-13 and § 160.156-13(h) of this subpart must be approved by the Commandant before being used in any production rescue boat. The manufacturer must submit any such change following the procedures set forth in § 160.156-9 of this subpart, but documentation on items that are unchanged from the plans approved under 46 CFR 159.005-13 and § 160.156-13(h) of this subpart need not be resubmitted.
(b) Unless determined by the Commandant to be unnecessary, a prototype rescue boat with each change described in paragraph (a) of this section must be made and tested according to the procedures for new approvals in §§ 160.156-9 through 160.156-13 of this subpart.
(c) Determinations of equivalence of design, construction, and materials will be made by the Commandant only.