94-15751. All Boiling-Water Reactors Issuance of Director's Decision Under 10 CFR 2.206
[Federal Register Volume 59, Number 124 (Wednesday, June 29, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-15751]
[[Page Unknown]]
[Federal Register: June 29, 1994]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
All Boiling-Water Reactors Issuance of Director's Decision Under
10 CFR 2.206
Notice is hereby given that the Director, Office of Nuclear Reactor
Regulation, has taken action with regard to a Petition by Mr. Paul M.
Blanch for action under 10 CFR 2.206. The Petition, dated August 12,
1993, pertains to all boiling-water reactors (BWRs).
The Petitioner requested that the NRC institute a proceeding
pursuant to 10 CFR 2.206 and require that the licensees of all BWRs
take certain actions with regard to the reactor vessel water level
instrumentation. The Petitioner requested that the licensee of each BWR
either conclusively demonstrate the operability of the condensate pots
and associated level instruments, interlocks, and emergency core
cooling system functions or be granted a plant-specific license
exemption with a plant-specific safety analysis. The Petitioner further
requested that, if operability cannot be demonstrated and the NRC does
not grant plant-specific relief from the regulations, each plant comply
with the action statements of the plant's technical specifications for
inoperable level instrumentation.
The Director, Office of Nuclear Reactor Regulation has determined
to deny the petition. The reasons for this denial are explained in the
``Director's Decision Pursuant to 10 CFR 2.206'' (DD-94-07), which is
available for public inspection at the Commission's Public Document
Room, the Gelman Building, 2120 L Street, N.W., Washington, D.C. 20555.
A copy of the Decision will be filed with the Secretary of the
Commission for the Commission's review in accordance with 10 CFR
2.206(c) of the Commission's regulations. As provided by this
regulation, the Decision will constitute the final action of the
Commission 25 days after the date of issuance unless the Commission on
its own motion institutes a review of the Decision within that time.
Dated at Rockville, Maryland, this 22nd day of June 1994.
For the Nuclear Regulatory Commission.
William T. Russell,
Director, Office of Nuclear Reactor Regulation.
[FR Doc. 94-15751 Filed 6-28-94; 8:45 am]
BILLING CODE 7590-01-M
Document Information
- Published:
- 06/29/1994
- Department:
- Nuclear Regulatory Commission
- Entry Type:
- Uncategorized Document
- Document Number:
- 94-15751
- Pages:
- 0-0 (1 pages)
- Docket Numbers:
- Federal Register: June 29, 1994