2024-18046. Airworthiness Directives; Embraer S.A. Airplanes  

  • Estimated Costs

    Action Labor cost Parts cost Cost per product Cost on U.S. operators
    Airplane groups 1 and 2—install structural reinforcements 22 work-hours × $85 per hour = $1,870 $1,600 $3,470 $242,900 (70 airplanes).
    Airplane groups 3, 4, and 5—install structural reinforcements and replace floor fasteners 14 work-hours × $85 per hour = $1,190 600 1,790 $200,480 (112 airplanes).
    Airplane groups 6 and 8—install structural reinforcements and replace floor fasteners 26 work-hours × $85 per hour = $2,210 2,000 4,210 $84,200 (20 airplanes).
    Airplane group 7—install structural reinforcements 20 work-hours × $85 per hour = $1,700 1,600 3,300 $16,500 (5 airplanes).
    Airplane group 9—install structural reinforcements 14 work-hours × $85 per hour = $1,190 1,600 2,790 $2,790 (1 airplane).

    The FAA estimates the following costs for the additional work that operators would be required to do for compliance with this proposed AD if they completed the actions in the original version of Embraer Service Bulletin SB505-25-0046, dated March 31, 2021; Service Bulletin SB505-25-0046, Revision 01, dated May 8, 2023; or Service Bulletin SB505-25-0046, Revision 02, dated February 19, 2024. The agency has no way of determining the number of airplanes that might need these actions:

    Estimated Costs

    Action Labor cost Parts cost Cost per product
    Inspect floor fasteners 9 work-hours × $85 per hour = $765 $50 $815
    Replace floor fasteners 1 work-hour × $85 per hour = $85 50 135
    ( print page 66644)
    Airplane groups 1 and 2 install reinforcement support on left-hand forward cabinet 2 work-hours × $85 per hour = $170 200 370

Document Information

Published:
08/16/2024
Department:
Federal Aviation Administration
Entry Type:
Proposed Rule
Action:
Notice of proposed rulemaking (NPRM).
Document Number:
2024-18046
Dates:
The FAA must receive comments on this NPRM by September 30, 2024.
Pages:
66642-66645 (4 pages)
Docket Numbers:
Docket No. FAA-2024-2020, Project Identifier MCAI-2024-00303-A
RINs:
2120-AA64: Airworthiness Directives
RIN Links:
https://www.federalregister.gov/regulations/2120-AA64/airworthiness-directives
Topics:
Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety
PDF File:
2024-18046.pdf
Supporting Documents:
» U.S. DOT/FAA - Supplemental AD Documents
CFR: (1)
14 CFR 39