2023-04505. Air Plan Approval; Georgia; Macon Area Limited Maintenance Plan for the 1997 8-Hour Ozone NAAQS  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Final rule.

    SUMMARY:

    The Environmental Protection Agency (EPA) is finalizing approval of a state implementation plan (SIP) revision submitted by the State of Georgia, through the Georgia Environmental Protection Division (EPD), on October 20, 2021. The SIP revision includes the Limited Maintenance Plan (LMP) for the Macon 1997 8-hour ozone national ambient air quality standards (NAAQS) maintenance area (hereinafter referred to as the Macon 1997 8-hour Ozone NAAQS Area or Macon Area or Area). The Macon 1997 8-hour NAAQS Area consists of all of Bibb County and a portion of Monroe County located in middle Georgia. EPA is finalizing approval because the Macon Area LMP provides for the maintenance of the 1997 8-hour ozone NAAQS within the Area through the end of the second 10-year portion of the maintenance period. This action makes certain commitments related to maintenance of the 1997 8-hour ozone NAAQS in the Area federally enforceable as part of the Georgia SIP.

    DATES:

    This rule is effective April 7, 2023.

    ADDRESSES:

    EPA has established a docket for this action under Docket Identification No. EPA-R04-OAR-2022-0203. All documents in the docket are listed on the www.regulations.gov website. Although listed in the index, some information may not be publicly available, i.e., Confidential Business Information or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the internet and will be publicly available only in hard copy form. Start Printed Page 14279 Publicly available docket materials are available either electronically through www.regulations.gov or in hard copy at the Air Regulatory Management Section, Air Planning and Implementation Branch, Air and Radiation Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street SW, Atlanta, Georgia 30303-8960. EPA requests that, if at all possible, you contact the person listed in the FOR FURTHER INFORMATION CONTACT section to schedule your inspection. The Regional Office's official hours of business are Monday through Friday 8:30 a.m. to 4:30 p.m., excluding Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Tiereny Bell, Air Regulatory Management Section, Air Planning and Implementation Branch, Air and Radiation Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street SW, Atlanta, Georgia 30303-8960. The telephone number is (404) 562-9088. Ms. Bell can also be reached via electronic mail at bell.tiereny@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Background

    In accordance with the Clean Air Act (CAA or Act), EPA is approving the Macon Area LMP for the 1997 8-hour ozone NAAQS, adopted by Georgia EPD on October 12, 2021, and submitted by Georgia EPD as a revision to the Georgia SIP on October 20, 2021. On April 30, 2004, the Macon Area was designated as nonattainment for the 1997 8-hour ozone NAAQS, effective June 15, 2004. See69 FR 23858 (April 30, 2004). Subsequently, in 2007 the Macon Area was redesignated to attainment for the 1997 8-hour ozone NAAQS with EPA's approval of the first 10-year maintenance plan, which was designed to keep the Area in attainment through 2017. See72 FR 53432 (September 19, 2007). The Macon Area LMP is designed to maintain the 1997 8-hour ozone NAAQS within the Macon Area through the end of the second 10-year portion of the maintenance period beyond redesignation.

    EPA is finalizing approval of the plan because it meets all applicable requirements under CAA sections 110 and 175A. As a general matter, the Macon Area LMP relies on the same control measures and contingency provisions to maintain the 1997 8-hour ozone NAAQS during the second 10-year portion of the maintenance period as the maintenance plan submitted by Georgia EPD for the first 10-year period.

    In a notice of proposed rulemaking (NPRM) published on December 28, 2022 (87 FR 79830), EPA proposed to approve the Macon Area LMP because the State made a showing, consistent with EPA's prior LMP guidance, that the Macon Area ozone concentrations are well below the 1997 8-hour ozone NAAQS and have been historically stable and that the Area has met all other maintenance plan requirements. The details of Georgia's submission, as well as EPA's rationale, are explained further in the December 28, 2022, NPRM. Comments on the December 28, 2022, NPRM were due on or before January 27, 2023. No adverse comments were received on the December 28, 2022, NPRM.

    II. Final Action

    In accordance with sections 110(k) and 175A of the CAA, and for the reasons set forth in the NPRM, EPA is finalizing approval of the Macon Area LMP for the 1997 8-hour ozone NAAQS, as submitted by Georgia EPD on October 20, 2021. EPA is finalizing approval of the Macon Area LMP because it includes an acceptable update of various elements of the 1997 8-hour ozone NAAQS Maintenance Plan approved by EPA for the first 10-year period (including emissions inventory, assurance of adequate monitoring and verification of continued attainment, and contingency provisions) and retains the relevant provisions of the SIP. EPA also finds that the Macon Area qualifies for the LMP option and that the Area's LMP adequately demonstrates maintenance of the 1997 8-hour ozone NAAQS through documentation of monitoring data showing maximum 1997 8-hour ozone levels well below the NAAQS and continuation of existing control measures. EPA believes that the Area's 1997 8-Hour Ozone LMP is sufficient to provide for maintenance of the 1997 8-hour ozone NAAQS in the Macon Area over the second 10-year maintenance period, through 2027, and thereby satisfies the requirements for such a plan under CAA section 175A(b).

    III. Statutory and Executive Order Reviews

    Under the CAA, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable Federal regulations. See42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the CAA. This action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:

    • Is not a significant regulatory action subject to review by the Office of Management and Budget under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);

    • Does not impose information collection burdens under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);

    • Is certified as not having significant economic impacts on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.);

    • Does not contain any unfunded mandates or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);
    • Does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);
    • Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);
    • Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);
    • Is not subject to requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and
    • Does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).

    This SIP revision is not approved to apply on any Indian reservation land or in any other area where EPA or an Indian tribe has demonstrated that a tribe has jurisdiction. In those areas of Indian country, the rule does not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), nor will it impose substantial direct costs on tribal governments or preempt tribal law.

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register . A major rule Start Printed Page 14280 cannot take effect until 60 days after it is published in the Federal Register . This action is not a “major rule” as defined by 5 U.S.C. 804(2).

    Under section 307(b)(1) of the CAA, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by May 8, 2023. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. See section 307(b)(2).

    Start List of Subjects

    List of Subjects in 40 CFR Part 52

    • Environmental Protection
    • Air Pollution Control
    • Incorporation by Reference
    • Intergovernmental Relations
    • Nitrogen Oxides
    • Ozone
    • Reporting and Recordkeeping Requirements
    • Volatile Organic Compounds
    End List of Subjects Start Signature

    Dated: February 28, 2023.

    Daniel Blackman,

    Regional Administrator, Region 4.

    End Signature

    For the reasons stated in the preamble, EPA amends 40 CFR part 52 as follows:

    Start Part

    PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

    End Part Start Amendment Part

    1. The authority citation for part 52 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 42 U.S.C. 7401 et seq.

    End Authority

    Subpart L—Georgia

    Start Amendment Part

    2. In § 52.570, amend the table in paragraph (e) by adding an entry for “1997 8-hour Ozone 2nd Maintenance Plan (Limited Maintenance Plan) for the Macon Area” at the end of the table to read as follows:

    End Amendment Part
    Identification of plan.
    * * * * *

    (e) * * *

    EPA-Approved Georgia Non-Regulatory Provisions

    Name of nonregulatory SIP provisionApplicable geographic or nonattainment areaState submittal date/effective dateEPA approval dateExplanation
    *         *         *         *         *         *         *
    1997 8-hour Ozone 2nd Maintenance Plan (Limited Maintenance Plan) for the Macon AreaBibb County and a portion of Monroe County10/20/20213/8/2023, [Insert citation of publication]
    End Supplemental Information

    [FR Doc. 2023-04505 Filed 3-7-23; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Effective Date:
4/7/2023
Published:
03/08/2023
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Final rule.
Document Number:
2023-04505
Dates:
This rule is effective April 7, 2023.
Pages:
14278-14280 (3 pages)
Docket Numbers:
EPA-R04-OAR-2022-0203, FRL-10510-02-R4
Topics:
Air pollution control, Environmental protection, Incorporation by reference, Intergovernmental relations, Nitrogen oxides, Ozone, Reporting and recordkeeping requirements, Volatile organic compounds
PDF File:
2023-04505.pdf
Supporting Documents:
» EPA-R04-OAR-2022-0203
» 8_Macon 1997 Ozone 2nd Limited Maintenance Plan SIP
» 4_GovDelivery_Macon_1997Ozone_2nd_LimitedMaintenancePlan
» 9_APPENDIX A
» 3_Macon_Certificate_Public_Hearing_Signed
» 2_SIP Checklists_1997Ozone_LMP Macon
» 5_EPA Comments_Prehearing for GA LMP for Macon
» 1_Transmittal_1997 8- Hour Ozone_Limited Maintenance Plan for Macon_Final
» 6_Comment Memo_1997 8-hr Ozone LMP Macon
» 7_Response to Comments_1997 Ozone LMP Macon
CFR: (1)
40 CFR 52.570