Figure F-1 to Subpart F of Part 53 - Designation Testing Checklist  


Latest version.
  • Figure F-1 to Subpart F of Part 53 - Designation Testing Checklist

    DESIGNATION TESTING CHECKLIST FOR CLASS II

    __________ __________ __________

    Auditee Auditor signature Date

    Compliance Status: Y = Yes N = No NA = Not applicable/Not available Verification Comments (Includes documentation of who, what, where, when, why) (Doc. #, Rev. #, Rev. Date)
    Verification Verified by Direct Observation of Process or of Documented Evidence: Performance, Design or Application Spec. Corresponding to Sections of 40 CFR Part 53, Subparts E and F
    Y N NA
    Subpart E: Performance Specification Tests
    Evaluation completed according to Subpart E § 53.50 to § 53.56
    Subpart E: Class I Sequential Tests
    Class II samplers that are also Class I (sequentialized) have passed the tests in § 53.57
    Subpart F: Performance Spec/Test
    Evaluation of Physical Characteristics of Clean Sampler - One of these tests must be performed:
    § 53.62 - Full Wind Tunnel
    § 53.63 - Inlet Aspiration
    § 53.64 - Static Fractionator
    Evaluation of Physical Characteristics of Loaded Sampler
    § 53.65 Loading Test
    One of the following tests must be performed for evaluation after loading: § 53.62, § 53.63, § 53.64
    Evaluation of the Volatile Characteristics of the Class II Sampler § 53.66